Laserfiche WebLink
111111111 ir <br />City of Tukwila <br />Planning Commission <br />Board of Architectural Review (BAR) Minutes <br />Date: March 28, 2013 <br />Time: 6:30 PM <br />Location: City Hall Council Chambers <br />Present: Commissioners Louise Strander, Chair; Brooke Alford, Sharon Mann, Miguel Maestas <br />Absent: Commissioners Thomas McLeod, Mike Hansen, Cassandra Hunter <br />Staff: Minnie Dhaliwal, Planning Supervisor; Brandon Miles, Senior Planner <br />Minutes: Commissioner Alford made a motion to adopt the minutes from the February 28th, 2013 <br />meeting. Commissioner Maestas seconded the motion. The motion was unanimously approved. <br />Chair Strander opened the public hearing at 6:35 pm for the following application: <br />CASE NUMBER: L12 -046 <br />APPLICANT: Bob Fadden on behalf of Wayne Jones <br />REQUEST: Public Hearing Design Review to consider the construction of a 17,000 square foot <br />commercial structure with associated parking on 2.35 acres within <br />Commercial/Light Industrial District. The proposed use of the building is warehouse <br />and office. <br />LOCATION: 4501 S. 134th P1 <br />Chair Strander swore in those wishing to testify. <br />Staff asked the Board of Architectural Review members the Appearance of Fairness questions. <br />Brandon Miles, Senior Planner, Department of Community Development, gave the staff presentation. He <br />explained that this project was originally approved in 2007 and a major modification to add an additional <br />story was approved in 2008. However the design review approval has expired as the construction did not <br />commence within three years of the design review approval. He clarified that the review of the current <br />application is based on current regulations. The project was previously issued a Special Permission decision <br />by the Director to reduce the stream buffer from 100 feet to 50 feet. The buffer has already been planted and <br />the monitoring period has started. <br />He described the site characteristics. The subject site is about 2.3 acres and is accessed from S. 134"' Pl. There <br />is no access from Macadam Road. The building is proposed in the middle of the site and includes a mix of <br />materials, modulation and earth tone colors. He circulated two colored elevations and the materials board. The <br />proposed building height is 32.5 feet and the mechanical equipment is screened by the parapet. <br />Staff recommended approval of the project with ten conditions as listed in the staff report dated March 8, <br />2013. The conditions of approval included the following: roof will utilize non -glare finishes and colors; <br />location of bicycle parking shall be approved as part of building permit review; fence shall be placed on the <br />inside of the perimeter landscaping; gate shall be added to the fence; a new fence shall be installed along <br />Macadam Rd S; and the dumpster enclosure shall be painted to match the building. <br />Page 1 of 3 <br />