City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2013-11-26 Item 3 - Adoption of 11/14/13 Minutes
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2013-11-26 Planning Commission - Tukwila Village Phase 1 (Continuation from 11/14/13 Meeting)
>
Planning 2013-11-26 Item 3 - Adoption of 11/14/13 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:10:39 PM
Creation date
11/25/2013 12:44:00 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
11/26/13
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BAR Public Hearing Minutes <br />November 14, 2013 <br />o Mr. Petersen — There was minimum code requirements for each building. The majority of the <br />bike racks are located in the parking garage for residents. Only a few bike racks are required in <br />the exterior area for Building C. Additional bike racks can be provided adjacent to Building C if <br />necessary. <br />• Is the @ symbol shown on the side of the common building for branding? <br />o Mr. Park responded they want to name the community center. The symbol is a place holder. <br />• What will the water feature look like when the water is not running for the rest of the season? <br />o Mr. Petersen - The plan is to have an enhanced paving design so it is visually interesting at other <br />times of the year as well as adding planting around the feature. <br />• Is there clear ADA access and is the amount adequate? <br />o Mr. Petersen - There are accessible parking stalls and the option to get around the stairs without <br />going too far out of the way. <br />Diana Keys, for the applicant gave highlights on the project specifically on Building A. She stated the designs of <br />the buildings are shaped by the site plan. She said that a large amount of time was spent developing the site plan, <br />site focal points, appropriate scale and masking for the building. She also stated this was the biggest scale density <br />project on the corridor. She pointed out key views on the focal point of the project and mentioned the commercial <br />uses are on the ground floor. She pointed out the space that is reserved for restaurant use by the development <br />agreement. The additional commercial space fronting along TIB creates varied streetscapcs for pedestrians and <br />individual shop fronts for each of the commercial spaces hoping to promote small start-up businesses. The focus is <br />to make Building A pedestrian friendly. She also provided an overview on building and color materials. <br />The applicant addressed the following questions raised by the Co ii issioners: <br />Chair McLeod <br />• Can the metal siding be dented, if for example a bicycle crashed into it <br />o Ms. Keys - It would have to be hit pretty hard. <br />• Is it easy to cover up graffiti on the metal'? <br />o Ms. Keys - It can, be re- painted. <br />Commissioner Mann <br />• How many levels of parking are there in Building A'? Will residents have secure parking? Will there be <br />parking inside the building for commercial use'? <br />o Ms. Keys - There are two levels of parking with two separate entrances. Each of the access points <br />to the garages is controlled by gates and each resident will have a garage opener. All the parking <br />n the building is for residents only. The surface parking is for commercial use. <br />• Is thc'c a plan to have a full kitchen in Building C. <br />o Ms. Keys - There will be a catering kitchen in the community room. The restaurant itself and the <br />cafe tenants will have a full kitchen. <br />• Could there be more emphasis on the treatment of the fireplace? <br />o Ms. Keys - It is projected out from the facade. So this could be a place where we can transition <br />aterials. <br />Commissioner Hanse: <br />• How large is the commercial space on the southwest end? <br />o Ms. Keys.,- The corner restaurant is 2,885 sq. ft., general retail is about 4,000 sq. ft., and the <br />corner space with the round entry feature is about 1,200 sq. ft. A total of 8,165 sq. ft. of <br />commercial space not including the live work. If we include the live work there is about 1,800 sq. <br />ft. <br />• Would a service corridor and restrooms be a part of the tenant improvement? <br />o Ms. Keys - Everything that happens within the commercial area is part of the tenant <br />improvement. The restaurant space has access to the garage so there will be direct access to a <br />trash room. A grease hood shaft will go up through the roof of the sunroom. <br />• How do you plan to manage the flow of materials and utilities? <br />• How will tenants be allowed to use their balconies, views seen from the street are critical? <br />o Ms. Keys - Balconies often become storage spaces and the management of the apartments will <br />need to control balcony use so it will not become storage areas. <br />Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.