City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2013-11-26 Item 3 - Adoption of 11/14/13 Minutes
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2013-11-26 Planning Commission - Tukwila Village Phase 1 (Continuation from 11/14/13 Meeting)
>
Planning 2013-11-26 Item 3 - Adoption of 11/14/13 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:10:39 PM
Creation date
11/25/2013 12:44:00 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
11/26/13
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BAR Public Hearing Minutes <br />November 14, 2013 <br />• Will a two stall restroom be adequate to serve the public, particularly during large gatherings? <br />o Ms. Keys -The building is compliant with code requirements. <br />Commissioner Hansen commented he thinks the facilities are inadequate and in order to be <br />successful it should be reviewed and accommodations made to service more people. <br />• Is there a committed tenant for the cafe? <br />o Mr. Park stated they do not have a lease agreement but a potential tenant is actively involved in <br />the design programming of both the cafe and community space. <br />The applicant proposed that the BAR approve their recommendations as follows: <br />1. Deny staff's recommended condition regarding the existing green street light standards. Applicant would like <br />the ability to negotiate lighting with the city staff. He is asking the recommendation be consistent for the <br />Tukwila Village project and the King County Library System. <br />2. Make adjustments to the transitional area between the Library and the plaza. They are asking for the <br />Commission to adopt the library's architect's landscape sketch and apply to both sites. <br />3. Tukwila Village is asking approval for their monument sign to be erected on the north side of the entrance and <br />the Library's on the south side. They are also asking that the setbacks on the sidewalk be identical on both <br />sides. <br />Chair McLeod asked the applicant to submit the requested <br />mmendationsto staff. <br />Commissioner Hansen noted the first recommendation refc <br />recommendation referenced Item 13, Bullet 1. <br />There was no public testimony. <br />Chair McLeod recommended postponing delibera <br />Chair McLeod closed the public hearing at 9:25 PM <br />d Item 11, Bullet 1 -2. The second <br />on of the Tuk' <br />la Village hearing to November 26, 2013. <br />Staff requested the BAR make a motion to extend the meeting in order to hear case number L13 -017, King County <br />Library System. <br />Commissioner Alford moved tQ cxtend the meeting past 9:30 PM to hear the King County Library Case. <br />Commissioner Hansen seconded the motion. The motion was unanimously approved. <br />Chair McLeod opened the public hearing for case number L13 -017 at 9:30 PM. <br />CASE NUMBER- L13 -017 <br />APPLICANT: Ryan Bussard, Perkins +Will for King County Library System <br />REQUEST: New 111,000 square foot library with landscaping and pedestrian improvements <br />LOCATION: 14380 Tukwila International Boulevard <br />Chair McLeod called for a rocess at 9:35 PM. <br />Chair McLeod reconvened the public hearing at 9:40 PM. <br />Chair McLeod swore in those wishing to testify. <br />Moira Bradshaw, Senior Planner, Community Development Department asked each of the Planning <br />Commissioners the appearance of fairness questions. Commissioners Strander and Mann both disclosed ex- <br />parte communication. There weren't any objections to the Planning Commissioners hearing the cases. <br />Ms. Bradshaw gave the presentation for Staff. The project consists of the building and pedestrian access only. She <br />stated the vehicular access and the parking for the property will be on the Tukwila Village site. There are no <br />specific criteria other than what's in the design manual. There was some negotiation with the City in terms of items <br />Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.