Laserfiche WebLink
TUKWILA 205 PROJECT INTERLOCAL AGREEMENT <br />ATTACHMENT A <br />"Division of Responsibilities for Maintenance <br />of the TUKWILA 205 PROJECT" <br />GREEN RIVER FLOOD CONTROL ZONE DISTRICT <br />The DISTRICT shall be responsible for all supervision, <br />inspections, assessments, record keeping, reporting, <br />maintenance, and normal and emergency operations as set forth in <br />Sections 2.01.d, 3.04 through 3.09, 4.02 through 4.06, 5.02, and <br />5.03 of the CORPS' O &M MANUAL, but only to the extent these apply <br />to the following specific elements of the TUKWILA 205 PROJECT: <br />(a) Modifications and improvements to the existing levee <br />system within the project area defined in Section 1.03, <br />to include all portions of existing levee sections which <br />were not substantially modified by construction of the <br />TUKWILA 205 PROJECT. These sections are referenced in <br />Section 1.06.a of the CORPS' O &M MANUAL, and are shown <br />on the TUKWILA 205 PROJECT drawings. <br />(b) Modifications and improvements to portions of <br />Christensen Road (in the City of Tukwila) and to <br />portions of Frager Road (in King County), with the <br />exception that all vehicular surfacing, paving, curbs, <br />gutters, sidewalks, storm drainage facilities and <br />appurtenances thereto necessary for the maintenance and <br />operation of these roadways as rights -of -way for <br />vehicular and /or pedestrian traffic shall remain the <br />sole responsibility of the respective local <br />jurisdiction, and not of the DISTRICT. This may limit <br />the DISTRICT's obligations otherwise pursuant to Section <br />4.03.a(1) (a) of the CORPS' O &M MANUAL. <br />(c) The P -17 Pump Station facility and all appurtenances <br />thereto which are or may be located within <br />rights -of -way, easements, or tracts of land granted <br />and /or conveyed to, and /or recorded in favor of the <br />DISTRICT. The District has no further obligation to <br />provide for interior drainage systems included within <br />the project definition and referenced or listed in <br />addition to the P -17 system in Sections 1.05, 1.06.b, <br />2.01.d, 3.07, 4.02.d(2), 4.04, and /or 4.05 of the <br />CORPS' O &M MANUAL, except: the District will, however, <br />fulfill the provisions of Sections 4.04. a (1) (a) (c) and <br />4.04.b(2) of the CORPS' O &M MANUAL regarding drainage <br />outfall structures where these pass through the levee, <br />to the extent such provisions are reasonably necessary <br />to fulfill the terms of Section 4.03.a(2)(a),(b). This <br />will include taking immediate steps to correct dangerous <br />conditions disclosed by any inspection or flood patrol. <br />