Laserfiche WebLink
0,2,3 <br />AGREEMENT <br />AMONG KING COUNTY AND THE CITIES OF RENTON AND TUKWILA <br />FOR THE DESIGN AND CONSTRUCTION OF <br />THE TRANS- VALLEY CORRIDOR <br />INTELLIGENT TRANSPORTATION SYSTEM <br />THIS AGREEMENT is made and entered into by and among King County, a political <br />subdivision of the State of Washington, hereinafter called the "County the City of Renton, <br />hereinafter called "Renton and the City of Tukwila, hereinafter called "Tukwila' The County, <br />Renton, and Tukwila are collectively referred to as the "Parties" Renton and Tukwila are <br />collectively referred to as the "Cities <br />1 SCOPE OF WORK <br />RECITALS <br />A. The County has a Capital Improvement Project (CIP #400400) along the Trans Valley <br />corridor "Comdor for the purpose of designing and constructing the integrated traffic <br />signal program for the Corridor, hereinafter called the "Project" <br />B The Corridor is defined as starting from SE 151st Street on Petrovitsky Road and follows <br />along on SE 176 Street, Carr Road, SW 43 Street, and onto S 180 Street where it ends <br />at Southcenter Parkway Portions of the Comdor are located in Renton, Tukwila, and <br />unincorporated King County <br />C Tukwila, Renton, and the County own traffic signals and related equipment along the <br />Comdor All additional equipment provided by the County as part of the Project will be <br />owned by the party with junsdiction <br />D The Parties agree that the construction of the Project would optimize the use of existing <br />signals and turn lanes along the Corridor <br />E. It is in the best interest of the Cities for the County to implement the Project. <br />NOW, THEREFORE, the Parties hereby covenant and agree as follows <br />AGREEMENT <br />The Project's scope of work includes the following design and construction of ITS <br />(Intelligent Transportation System) solutions to reduce existing corridor delays and improve <br />incident management for the Corridor The solutions include the following specific design <br />requirements <br />Install Eagle M -50 controllers or controller with equivalent software throughout the <br />1 <br />CAG -04 -034 <br />