06-037(a)
<br />Council Approval 12/5/11
<br />Washington State
<br />WI/ Department of Twanspolrtation Local Agency Agreement Supplement
<br />Agency Supplement Number
<br />Citv of Tukwila 1
<br />Federal Aid Project Number Agreement Number CFDA No. 20.205
<br />STPE 1320(002) LA 6065 (Catalog of Federal Domestic Assistance)
<br />The Local Agency desires to supplement the agreement entered into and executed on April 20,2006
<br />All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
<br />The changes to the agreement are described as follows:
<br />Project Description
<br />Name Tukwila Urban Center Pedestrian/Bike Bridge over Green River Length 0.64 mile
<br />Termini approximately between Baker Blvd (if extended) and Longacres Way (if extended)
<br />Description of Work No Change
<br />Non motorized bridge over Green River and wayfmding approach improvements along Baker Blvd to include bike lanes, trail
<br />connector to the Interurban Trail east of West Valley Highway, and a new pedestrian signal on West Valley Highway
<br />Reason for Supplement
<br />Obligation of additional Enhancement Funds and CMAQ Funds
<br />Does this change require additional Right of Way or Easements?
<br />Yes No
<br />Estimate of Funding
<br />(2) (3) (4) (5)
<br />Supplement Estimated Total Estimated Agency Estimated
<br />Project Funds Funds Federal Funds
<br />500,000.00 690,000.001 1
<br />868,015.00 868,015.001 117,182.00
<br />1 10,000.001
<br />1,368,015.001 1,568,015.00
<br />117,182.001
<br />1
<br />690,000.00
<br />750,833.00
<br />10,000.00
<br />1,450,833.00
<br />o. Agency
<br />Federal Aid
<br />Participation P• State
<br />Ratio for CN o. Total CN Cost Estimate (k+H+m+n+o+o)
<br />r. Total Proiect Cost Estimate (e+i+a) 2 00.000.00 1 1.368,015.00 1.568.015.00 117,182.00 A.450.833.00
<br />The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
<br />to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
<br />Agency Off' 'al J Washington State p ansportation
<br />`gyp/
<br />By a+� By v n
<br />Title Mai r Director of Highways and Local Programs
<br />o� rr��cv� ta, AR 0 2012
<br />i U Date Executed
<br />DOT Form 140 EF d o OQ1 IA
<br />Revised 1/2007
<br />Ty of Work
<br />yp
<br />Previous
<br />Agreement/Suppl.
<br />PE
<br />a. Agency
<br />1
<br />010
<br />b. Other Conslt. STPE 100%
<br />190,000.00
<br />c. Other Conslt. CMAQ 86.5%
<br />Federal Aid
<br />d. State
<br />10,000.00
<br />Participation
<br />Ratio for PE
<br />e. Total PE Cost Estimate (a +b +c +d)
<br />1 200,000.00
<br />Right of Way f. Agency
<br />1
<br />a. Other
<br />Federal Aid
<br />h. Other
<br />Participation
<br />Ratio for RW
<br />i. State
<br />j. Total RNV Cost Estimate (f +g +h +i)
<br />Construction k. Contract
<br />1
<br />I. Other
<br />m. Other
<br />1
<br />n. Other
<br />Yes No
<br />Estimate of Funding
<br />(2) (3) (4) (5)
<br />Supplement Estimated Total Estimated Agency Estimated
<br />Project Funds Funds Federal Funds
<br />500,000.00 690,000.001 1
<br />868,015.00 868,015.001 117,182.00
<br />1 10,000.001
<br />1,368,015.001 1,568,015.00
<br />117,182.001
<br />1
<br />690,000.00
<br />750,833.00
<br />10,000.00
<br />1,450,833.00
<br />o. Agency
<br />Federal Aid
<br />Participation P• State
<br />Ratio for CN o. Total CN Cost Estimate (k+H+m+n+o+o)
<br />r. Total Proiect Cost Estimate (e+i+a) 2 00.000.00 1 1.368,015.00 1.568.015.00 117,182.00 A.450.833.00
<br />The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
<br />to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
<br />Agency Off' 'al J Washington State p ansportation
<br />`gyp/
<br />By a+� By v n
<br />Title Mai r Director of Highways and Local Programs
<br />o� rr��cv� ta, AR 0 2012
<br />i U Date Executed
<br />DOT Form 140 EF d o OQ1 IA
<br />Revised 1/2007
<br />
|