Laserfiche WebLink
Adft <br />Washington State <br />wo Department of Transportation <br />I Prefix <br />Route <br />Federal Aid <br />Proiect Number <br />Local Agency <br />Proiect Number 90510403 <br />Agency <br />City of Tukwila <br />Project Title <br />Tukwila Urban Center Pedestrian/Bicycle Bridge over Green <br />Date 02/09/2012 <br />Central Contractor <br />Registration Exp.Date 07/20/2013 <br />WSDOT Federal Employer <br />Use Only Tax ID Number 91- 6001519 <br />Federal Program Title <br />20.205 Other <br />Start Latitude N 47.452545 Start Longitude W 122.262442 <br />River <br />Total <br />End Latitude N47459896 <br />End Longitude W -122.262249 <br />Project Termini From To <br />(Nearest Hundred Dollar) <br />Nearest City Name <br />Project Zip Code <br />Baker Blvd (if extended) <br />S 168th St <br />Tukwila <br />98188 <br />From: To: <br />Length of Project <br />Award Type <br />0.64 mile <br />Local Local Forces State Railroad <br />Federal Agency <br />City Number <br />County Number County Name <br />WSDOT Region <br />FHWA Others <br />1320 <br />17 King <br />Northwest Region <br />Congressional District <br />Legislative Districts <br />Urban Area Number <br />TMA MPO RTPO <br />9 <br />11 <br />1 <br />PSRC <br />Local Agency <br />Funding <br />(Nearest Hundred Dollar) <br />$1 17,200 <br />$120,000 <br />$2,400,000 <br />$2,637,200 <br />06- 037(a) <br />Council Approval 12/5/11 <br />Local Agency Federal Aid <br />Project Prospectus <br />Federal Funds <br />(Nearest Hundred Dollar) <br />$1,450,900 <br />$480,000 <br />$5,100,000 <br />$7.030.900 <br />Description of Existing Facility (Existing Design and Present Condition) <br />Roadway Width Number of Lanes <br />n/a n/a <br />n/a <br />Phase Start <br />Date <br />Month Year <br />5/06 <br />1/14 <br />1/15 <br />Description of Proposed Work <br />Description of Proposed Work (Attach additional sheet(s) if necessary) <br />Design and preliminary engineering of a new pedestrian/bicycle bridge across the Green River, connecting the Tukwila Urban <br />Center "core" to the Sounder Commuter Rail/Amtrak Station and surrounding neighborhood of transit- oriented development. <br />This will improve public access to the station from all parts of the center and provide a direct, safe and enjoyable walking and <br />bicycling experience. The high level of urban amenity will attract the types and densities of uses envisioned in a regional center. <br />The bridge type will be a twin -tied arch bridge. The design includes way finding approaches to the bridge on both sides of the <br />Green River to nrovide logical and useable annroaches for all users. <br />Local Agency Contact Person Title Phone <br />Cyndy Knighton Senior Engineer 206 431 -2450 <br />Mailing Address City State Zip Code <br />6300 Southcenter Blvd, Suite 100 Tukwila WA 98188 <br />By <br />Project Prospectus Approval Approving Authority <br />Title Public Works Director Date 2 q 1 Z <br />DOT Form 140 -101 EF Page 1 of 3 Previous Editions Obsolete <br />Revised 11/10 <br />Total <br />Phase <br />Estimated Cost <br />(Nearest Hundred Dollar) <br />P.E. <br />I $1,568,100 <br />R/W <br />I $600,000 <br />Const. <br />I $7,500,000 <br />Total <br />$9.668300 <br />Local Agency <br />Funding <br />(Nearest Hundred Dollar) <br />$1 17,200 <br />$120,000 <br />$2,400,000 <br />$2,637,200 <br />06- 037(a) <br />Council Approval 12/5/11 <br />Local Agency Federal Aid <br />Project Prospectus <br />Federal Funds <br />(Nearest Hundred Dollar) <br />$1,450,900 <br />$480,000 <br />$5,100,000 <br />$7.030.900 <br />Description of Existing Facility (Existing Design and Present Condition) <br />Roadway Width Number of Lanes <br />n/a n/a <br />n/a <br />Phase Start <br />Date <br />Month Year <br />5/06 <br />1/14 <br />1/15 <br />Description of Proposed Work <br />Description of Proposed Work (Attach additional sheet(s) if necessary) <br />Design and preliminary engineering of a new pedestrian/bicycle bridge across the Green River, connecting the Tukwila Urban <br />Center "core" to the Sounder Commuter Rail/Amtrak Station and surrounding neighborhood of transit- oriented development. <br />This will improve public access to the station from all parts of the center and provide a direct, safe and enjoyable walking and <br />bicycling experience. The high level of urban amenity will attract the types and densities of uses envisioned in a regional center. <br />The bridge type will be a twin -tied arch bridge. The design includes way finding approaches to the bridge on both sides of the <br />Green River to nrovide logical and useable annroaches for all users. <br />Local Agency Contact Person Title Phone <br />Cyndy Knighton Senior Engineer 206 431 -2450 <br />Mailing Address City State Zip Code <br />6300 Southcenter Blvd, Suite 100 Tukwila WA 98188 <br />By <br />Project Prospectus Approval Approving Authority <br />Title Public Works Director Date 2 q 1 Z <br />DOT Form 140 -101 EF Page 1 of 3 Previous Editions Obsolete <br />Revised 11/10 <br />