Laserfiche WebLink
Agency <br />City of Tukwila <br />Project Title Date <br />Tukwila Urban Center Pedestrian/Bicycle Bridge 02/09/2012 <br />ape of Proposed Work <br />Project Type (Check all that Apply) <br />New Construction Path Trail <br />Reconstruction Pedestrian Facilities <br />Railroad Parking <br />Bridge <br />Geometric Design Data <br />Description <br />Federal <br />Functional <br />Classification <br />Terrain <br />Posted Speed <br />Design Speed <br />Existing ADT <br />Design Year ADT <br />Design Year <br />Design Hourly Volume (DHV) <br />Roadway Width <br />Number of Lanes <br />3 -R n/a <br />2 -R <br />Other <br />n/a <br />Through Route <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />KPFF (Consultant) <br />Construction Will Be Performed By <br />TBD <br />Environmental Classification <br />Final Preliminary <br />Class I Environmental Impact Statement (EIS) <br />Project Involves NEPA/SEPA Section 404 <br />Interagency Agreement <br />Class III Environmental Assessment (EA) <br />Project Involves NEPA/SEPA Section 404 <br />Interagency Agreement <br />Principal Arterial <br />Urban <br />Minor Arterial <br />Urban <br />Collector <br />Major Collector <br />Rural <br />Minor Collector <br />Rural <br />Access Street/Road <br />Flat <br />Roll Mountain <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />KPFF (Consultant) <br />Construction Will Be Performed By <br />TBD <br />Environmental Classification <br />Final Preliminary <br />Class I Environmental Impact Statement (EIS) <br />Project Involves NEPA/SEPA Section 404 <br />Interagency Agreement <br />Class III Environmental Assessment (EA) <br />Project Involves NEPA/SEPA Section 404 <br />Interagency Agreement <br />Others Agency <br />100 <br />Contract Agency <br />100 <br />Class II Categorically Excluded (CE) <br />Projects Requiring Documentation <br />(Documented CE) <br />Environmental Considerations <br />Bridge will cross the Green River, a major salmon bearing river in a flood plain. Appropriate environmental considerations are <br />required including fisheries, river control, and archeological. Impacts to adjacent businesses and homeowners require <br />consideration of noise and environmental justice. <br />DOT Form 140 -101 EF Page 2 of 3 <br />Revised 11/10 <br />Crossroad <br />Principal Arterial <br />Urban <br />Minor Arterial <br />Collector <br />Major Collector <br />Rural <br />Minor Collector <br />Access Street/Road <br />Flat <br />Roll Mountain <br />Others Agency <br />100 <br />Contract Agency <br />100 <br />Class II Categorically Excluded (CE) <br />Projects Requiring Documentation <br />(Documented CE) <br />Environmental Considerations <br />Bridge will cross the Green River, a major salmon bearing river in a flood plain. Appropriate environmental considerations are <br />required including fisheries, river control, and archeological. Impacts to adjacent businesses and homeowners require <br />consideration of noise and environmental justice. <br />DOT Form 140 -101 EF Page 2 of 3 <br />Revised 11/10 <br />