City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
07-098 - City of SeaTac - Electrical Inspections
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
07-098 - City of SeaTac - Electrical Inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2010 1:39:07 PM
Creation date
10/4/2010 9:00:29 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
07-098
Contractor (example *sabey*)
City of SeaTac
Description (example *tourism*)
Electrical Inspections
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. Electrical Permit Fees. <br />APPENDIX "A" <br />NEW SINGLE FAMILY DWELLINGS <br />New single family dwellings (including a garage) $140 <br />Garages, pools, spas and outbuildings 75. <br />Low voltage systems 55 <br />SINGLE FAMILY REMODEL AND SERVICE CHANGES. <br />Service change or alteration no added /altered circuits 75 <br />Service change with added /altered circuits 75. plus $10 for each <br />added circuit (maximum permit fee $140). <br />Circuits added /altered without service change (includes up to 5 circuits) 50. <br />Circuits added /altered without service change (more than 5 circuits) $50 plus $7 for each <br />added circuit (maximum permit fee $90 <br />Meter /mast repair $65. <br />Low voltage systems $55. <br />MULTIFAMILY AND COMMERCIAL (Including low voltage). <br />VALUATION of electrical contract. PERMIT FEE <br />250 or less I $58 <br />251 $1000 $58 for the first $250 plus $4.00 for each $100 or <br />fraction thereof, to and including $1000 <br />$1,001 $5,000 $84 for the first $1000 plus $20 for each $1000 or <br />fraction thereof, to and including $5,000 <br />$5001 $50,000 $164 for the first $5000 plus $16.40 for each $1000 <br />or fraction thereof, to and including $50,000. <br />$50,001 $250,000 $902 for the first $$50,000 plus $12.00 for each <br />$1000 or fraction thereof, to and inoluding <br />$250,000. <br />$250,001 $1,000,000 $3302 for the first $250,000 plus $8.50 for each <br />$1000 or fraction thereof, to and including <br />$1,000,000. <br />Over $1,000,000 I $9,677 plus 0.5 of cost over one million. <br />Plan review fee In addition to the permit fee, when plan review is required, including fire <br />alarm systems, a plan review fee must be paid at the'time of permit application equal to 25% of <br />the permit fee with a minimum of $58. <br />MISCELLANEOUS FEES. <br />Temporary service (residential) $58. <br />Manufactured /mobile home service (Excluding garage or outbuildings) 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.