City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
08-070 - King County Water District #125 - Tukwila International Boulevard Phase II & III Utility Relocation
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
08-070 - King County Water District #125 - Tukwila International Boulevard Phase II & III Utility Relocation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2011 10:05:51 AM
Creation date
10/4/2010 9:01:21 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
08-070
Contractor (example *sabey*)
King County Water District #125
Description (example *tourism*)
Tukwila Intl Blvd Utility Relocation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Invoice. Water District 125 agrees to pay the City within forty -five (45) days of <br />receiving a correct invoice from the City for completed work approved by the District <br />and which Water District 125 has agreed to pay under this Agreement. Failure to pay on <br />time may result in a Stop Work Order being issued for the District Work and possible <br />claims of delay by the contractor. <br />F. Final Acceptance. The City shall provide Water District 125 with written notice of <br />completion of the District Work. The District inspector shall perfouii final inspection of <br />the District Work within five (5) days of written notice. The District shall, within two (2) <br />business days of its final inspection, provide to the City written final acceptance of the <br />District Work, or, alternatively, provide an itemized and detailed response why final <br />acceptance of the District Work cannot be given. If the District fails to respond to the <br />City within the prescribed timeline, the District shall be deemed to have given final <br />acceptance of the District Work. Upon final acceptance of the District Work, the City <br />shall assign its rights under the Project Contract relating to the District Work to the <br />District, including any warranties and maintenance obligations by and from the City's <br />Contractor arising out of the Project Contract for the District Work. The City shall also <br />require the City's Contractor, as a condition of the Project contract, to provide a bond to <br />insure that the District Work is free from defects in workmanship and materials for a <br />period of one (1) year following final acceptance of the Project Work by the City. <br />G. Defective or Unauthorized Work. Water District 125 reserves the right to withhold <br />payment from the City for any defective, incomplete or unauthorized work perfoimed by <br />the Contractor; provided, the District shall be deemed to have waived this right as to any <br />part of the District Work that has been accepted by the District. This waiver shall not <br />waive any claim by the District against the Contractor for any defective, incomplete or <br />unauthorized work or to any damage inflicted by the Contractor or one of his <br />subcontractors to completed District Work following District acceptance. Defective, <br />incomplete or unauthorized work includes, without limitation: work and materials that do <br />not confoiiii to the requirements of this Agreement, and extra work and materials <br />furnished without Water District 125's written approval. <br />H. As -Built Drawings. The City shall provide the District with "as built" drawings for the <br />District Work following the City's final acceptance of the Project Work. <br />4. WITHDRAWAL FROM AGREEMENT <br />Should Water District 125, upon review of the bid, which is acceptable to the City, elect <br />not to have the City's contractor install the District Work, Water District 125 shall promptly <br />issue to the City written notice of withdrawal from this agreement and this agreement shall <br />terminate. Water District 125 shall be responsible to reimburse the City for its reasonable <br />costs related to the District Work through the date of teimination. It will then be the <br />responsibility of Water District 125 to coordinate and install their facilities in a time and <br />manner that will not delay the City's contractor. Water District 125 shall be responsible for <br />any delay to the City's project due to Water District 125's water relocation work. <br />S \TIB Phase 2 &3 95- RWO3 005 Design Review \Utility Coordination \3rd Party Coordination Agreements \TIB Ph2 &3 WD125 <br />Coordination Agreement 06- 19- 08.doc (Printed 6/19/08) Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.