Laserfiche WebLink
TIB Ph2 /3 (95- RW -03) <br />Exhibit A Scope of Work —Valley View Sewer System Adjustments <br />The following Scope of Work will be included in the Project Work following the <br />execution of a Coordination Agreement for the Project listed above. The District will be <br />responsible for paying these costs by compensation to Tukwila as detailed in the <br />Coordination Agreement and the relevant attachments. Additional costs may be assessed <br />to the District as allowed by the Agreement and /or as detailed below. <br />BID SCHEDULE E: Valley View Sewer System Adiustments <br />ITEM ITEM QUANTITY UNIT TOTAL <br />NO. DESCRIPTION PRICE AMOUNT <br />1. Install 1 foot 48" MH section <br />1 EA <br />Price in Words <br />2. Install 2 foot 48" MH section <br />Price in Words <br />3. Install 3 foot 48" MH cone <br />Price in Words <br />5 Adjust casting to Grade <br />Price in Words <br />7 Abandon Sewer MH <br />Price in Words <br />8. Trench Safety <br />Price in Words <br />1 EA <br />9 EA <br />Price in Words <br />4 Replace Frame Cover w /Locking <br />Frame and Cover 15 EA <br />15 EA <br />Price in Words <br />6. Remove or Abandon /Fill Sewer <br />Pipe /Casing 170 LF <br />1 EA <br />LS <br />S• \TIB Phase 2 &3 95- RW03 005 Design Review \Utility Coordination\3rd Party Coordination Agreements \TIB Ph2 &3 <br />ValView Coordination Agreement Exhibit A.doc 06/25/2008 <br />Page 1 of 2 <br />