ADDITIONAL COST ITEMS <br />The Contract Documents will provide additional provisions for Extra Work which cannot <br />be completely quantified at the time of bid. These work items will be included in the bid <br />schedule as either Unit Price or Force Account line items in a separate schedule from the <br />"Valley View Sewer System Adjustments" and will be billed according to the <br />proportion of Extra Work associated with each specific utility. <br />Two examples of such Extra Work items include "Potholing" and "Resolution of Utility <br />Conflicts The potholing item will be used to assess potential conflicts between planned <br />Project Work and existing District utilities, which were not accurately located during <br />design, and the RUC item will track any impact that a conflict creates with the Project <br />Work as bid. The District acknowledges that approval of the final contract documents, <br />which includes these Extra Work items, signifies its acceptance of these items as a <br />method of reimbursement up to the maximum approved by Tukwila's contract authority. <br />The District will be given the option to perform any required Extra Work with their own <br />forces, use one or more of these Extra Work items, or approve a Change Order to include <br />the work in the City's contract for additional compensation. In either case any impact to <br />the project schedule may be assessed against the District if the Extra Work delays the <br />project completion date and the District could have anticipated and avoided the delay. <br />The impact will be charged to the District at the rate to be determined by the Project <br />Engineer on a case by case basis as allowed in the DOT Standard Specifications and <br />applicable law. <br />S \TIB Phase 2 &3 95- RW03 005 Design Review \Utility Coordination \3rd Party Coordination Agreements \TIB Ph2 &3 <br />ValView Coordination Agreement Exhibit A.doc 06/25/2008 <br />Page 2 of 2 <br />