City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
08-071 - Valley View Sewer District - Tukwila International Boulevard Phase II & III Sewer Facility Adjustments
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
08-071 - Valley View Sewer District - Tukwila International Boulevard Phase II & III Sewer Facility Adjustments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2011 1:40:38 PM
Creation date
10/4/2010 9:01:22 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
08-071
Contractor (example *sabey*)
Valley View Sewer District
Description (example *tourism*)
TIB Tukwila Intl Blvd Sewer Facility Adjustme
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TIB Ph2 /3 (95- RW -03) <br />Exhibit B <br />Valley View Sewer Work Timeline and Schedule <br />1) The District will be provided, through appropriate contract language, a minimum <br />of sixty (60) days written Notice of Pending Conflict by the City's contractor for <br />all known utilities which require removal or relocation to avoid hindering the <br />progress of project construction. This notice will include utilities which have not <br />been designated as part of the District Work to be performed by the Contractor as <br />Project Work. <br />2) For utility relocation requiring cut over of existing services a sixty (60) day work <br />window will be provided to the utility, including thirty (30) days to install and <br />energize new water mains and other necessary infrastructure, fifteen (15) days to <br />complete transfer of existing services to the new system (assuming previous <br />service routes can be reused or new service routes are in place), and fifteen (15) <br />days to remove the obsolete utilities. <br />3) Minor utility adjustments which do not require cut over of existing services to <br />new infrastructure will be given a fifteen (15) day work window to adjust utilities <br />to avoid conflict. <br />4) In all cases the work window will start when utility crews have full and <br />unrestricted access to the relocation zone and any applicable infrastructure <br />included in the contract designed to accept the relocated utility is in place. <br />Note All time intervals will be measured in Calendar days. <br />S: \TIB Phase 2 &3 95- RWO3 005 Design Review \Utility Coordination \3rd Party Coordination Agreements \TIB Ph2 &3 <br />ValView Coordination Agreement Exhibit B.doc 06/25/2008 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.