Laserfiche WebLink
5. The City shall move the setback wall back from the landward toe of the existing levee in <br />the northernmost setback segment near the West Valley Highway, consistent with the <br />alternate alignment described by GEI Consultants, Inc., in section 8.3.2.5 of its April, <br />2012 draft FEMA Accreditation Report for the Briscoe - Desimone Levee System. <br />6. The plan to address potential corrosion of the sheet pile walls shall be submitted for <br />consideration and approval by the District in the Levee construction plan review process. <br />7. The agreement with the Washington State Department of Transportation shall be <br />approved by the District prior to the release of State or District funds for Reach 1 of the <br />Levee. <br />8. To assist in implementing the District plan for emergency repairs, the City shall provide <br />project design information and emergency planning recommendations of observations, <br />physical measurements, tolerances, thresholds, and considerations for the District's <br />inspection and risk -based decision - making as appropriate for emergency plans associated <br />with the Levee design. The City will provide this information to the District by August 1, <br />2014. <br />9. The City shall permit, design, and construct replacement of the trail to meet King County <br />Parks regional trail standards. The City shall submit plans to King County Parks for <br />review coincident with District plan review at each design phase. <br />16 <br />EC approved (RB-RK) <br />