City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
14-020 - City of Kent - Briscoe-Desimone Levee Repair
COT-City
>
City Clerk
>
Interlocal Agreements
>
2010-2015 Interlocal Agreements
>
14-020 - City of Kent - Briscoe-Desimone Levee Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 9:59:55 AM
Creation date
2/28/2014 9:59:23 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
14-020
Contractor (example *sabey*)
City of Kent
Description (example *tourism*)
Briscoe-Desimone Levee Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT C <br />Levee Inspection, Maintenance, Operation and Repair <br />1. The Levee shall be maintained and operated consistent with the District's Flood Hazard <br />Management Plan Policy PROJ -6, Flood Protection Facility Design and Maintenance <br />Objectives (or its successor) which states as follows: <br />"[The District] should construct new flood protection facilities and maintain, <br />repair or replace existing flood protection facilities in such a way as to: <br />• Require minimal maintenance over the long term, <br />• Ensure that flood or channel migration risks are not transferred to other <br />sites, <br />® Protect or enhance aquatic, riparian and other critical habitats, and <br />® Protect or enhance multiple beneficial uses of flood hazard area." <br />2. Levee maintenance and operation shall be based on a risk -based analysis approach. If a <br />risk -based approach is not acceptable to FEMA, and as a result FEMA fails to issue a <br />CLOMR or LOMR for the Levee, the District shall not be obligated to operate and <br />maintain the Levee. <br />3. The upper 1/3 of the riverward slope above the OHWM may be mowed and maintained <br />in grass cover. <br />4. The Levee crest shall be maintained to provide for unimpeded vehicular access at all <br />times, including access by heavy construction equipment and earth - hauling machinery. <br />5. The landward Levee slope may be mowed and maintained in grass cover. <br />6. The 15 -foot maintenance access and inspection area along the landward Levee toe may <br />be mowed and maintained in grass cover. <br />7. All such mowed areas may alternatively be planted and maintained with native riparian <br />woody vegetation. <br />8. Upon acceptance of completed Levee construction by the District, the Levee, as <br />constructed to these standards, shall be inspected by the District prior to leaf emergence <br />each spring, at low -flow conditions in the late Summer or early Fall, prior to the onset of <br />17 <br />EC approved (RB -RK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.