City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2016-11-10 Item 4 - TMC Chapter 18.52 Landscaping Code Update: Attachment E - SEPA Application and Checklist
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2016-11-10 Planning Commission Public Hearing - TMC Chapter 18.52 Landscaping Code Update / SEPA Application
>
Planning 2016-11-10 Item 4 - TMC Chapter 18.52 Landscaping Code Update: Attachment E - SEPA Application and Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 10:39:49 AM
Creation date
11/3/2016 10:39:48 AM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
11/10/16
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. ENVIRONMENTAL ELEMENTS <br />L EazlA <br />a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, <br />mountainous, other: <br />N/A - This is a non - project action. Possible sites to be developed or <br />redeveloped are located throughout the City with varying topography <br />and soils. <br />b. What is the steepest slope on the site (approximate percent slope)? <br />N/A <br />c. What general types of soils are found on the site (for example, clay, sand, gravel, <br />peat, muck)? If you know the classification of agricultural soils, specify them and <br />note any prime farmland and whether the proposal results in removing any of <br />these soils. <br />Varies <br />d. Are there surface indications or history of unstable soils in the immediate <br />vicinity? If so, describe. <br />N/A — Non - Project Action <br />e. Describe the purpose, type, and approximate quantities of any filling or <br />grading proposed. Indicate source of fill. <br />N/A — Non - Project Action <br />f. Could erosion occur as a result of clearing, construction, or <br />use? If so, generally describe. <br />N/A — Non - Project Action <br />g. About what percent of the site will be covered with impervious surfaces <br />after project construction (for example, asphalt or buildings)? <br />N/A — Non - Project Action <br />SEPA Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.