City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-01-24 Item 2C - Contract Amendment #2 - 53rd Avenue South (South 137th Street - South 144th Street) Real Estate Acquisition with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-01-24 Transportation and Infrastructure
>
TIC 2017-01-24 Item 2C - Contract Amendment #2 - 53rd Avenue South (South 137th Street - South 144th Street) Real Estate Acquisition with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:44 PM
Creation date
1/19/2017 3:27:42 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
01/24/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF WORK: <br />Task 8 Right of Way Calculations <br />8.4 Right of way acquisition services will be provided by RES Group Northwest under <br />subcontract to the Consultant in accordance with the scope of work, assumptions, <br />and deliverables included as Attachment 1. School district negotiations will be <br />performed by the City and is not included in this scope of work. The level of effort <br />for negotiation of each parcel is lower than is typical for this type of project in order <br />to meet project budget constraints based on the assumption that this will be a <br />straight forward acquisition with minimal negotiations required. <br />Additional Services <br />The City may require additional services of the Consultant in order to advance all or portions of <br />the project corridor through final design and construction. This work may include items <br />identified in the current task authorizations as well other items, which may include, but are not <br />necessarily limited to the following: <br />♦ Obtaining title reports and providing final right of way / easement legal <br />descriptions and exhibits beyond the quantity estimated in the scope (19 <br />parcels) <br />♦ Providing additional property appraisals and negotiations <br />♦ Providing additional permitting or environmental studies <br />♦ Providing additional design services <br />♦ Providing construction services <br />These services will be authorized under a future contract supplement if necessary. At the <br />time these services are required, the Consultant shall provide a detailed scope of work and <br />an estimate of costs. The Consultant shall not proceed with the work until the City has <br />authorized the work and issued a notice to proceed. <br />City of Tukwila Page 2 of 2 KPG 34 <br />53 ' Avenue South 11912017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.