Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br /> 2017 to 2022 <br /> PROJECT: Boeing Access Rd Over BNRR Bridge Rehabilitation Project No. 99410408 <br /> DESCRIPTION: Rehabilitate the existing bridge with a 340'long concrete or steel bridge structure. It will be 6 lanes <br /> and have a sidewalk on one side. <br /> The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete <br /> JUSTIFICATION: spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet <br /> current bridge standards. <br /> Type, size, and location draft report(specifically required for bridges)was completed in 2005. Federal <br /> STATUS: grant applications were submitted in 2008 and 2010 and the bridge rehabilitation was successful for <br /> funding in 2012 for federal bridge funds.A Public Works Trust Fund (PWTF) loan was rescinded in 2013. <br /> MAINT. IMPACT: Maintenance will be reduced. <br /> COMMENT: Bridge will be rehabilitated in phases to allow continued traffic use. Federal bridge grant of$9,745,600 <br /> requires a 20% local match.A bond issue for the City match was issued in 2015 with the Interurban Ave S. <br /> FINANCIAL Through Estimated <br /> (in$000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br /> EXPENSES <br /> Design 1,249 104 1,353 <br /> Land (R/W) 100 100 <br /> Const. Mgmt. 1,124 1,124 <br /> Construction 9,745 9,745 <br /> TOTAL EXPENSES 1,249 204 10,869 0 0 0 0 0 0 12,322 <br /> FUND SOURCES <br /> Awarded Grant 905 163 8,677 9,745 <br /> Proposed Grant 0 <br /> Fund Balance-Bond 344 41 2,192 2,577 <br /> Mitigation 0 <br /> City Oper. Revenue 0 0 0 0 0 0 0 0 0 0 <br /> TOTAL SOURCES 1,249 204 10,869 0 0 0 0 0 0 12,322 <br /> PPCI.1L-'Ct Lo7tP7 s a <br /> i <br /> Vi <br /> •kr, PiD <br /> St '{> m <br /> r ' <br /> Tfl� R I <br /> y� ( ff <br /> Kee, � a � �€sn i Y 2t3 t_ �,•j 4 f�'3.� � f,;4�1� <br /> 10 <br /> 2017-2022 Capital Improvement Program 10 <br />