City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2C - Agreement - Boeing Access Road Over BNRR Bridge Rehabilitation Construction Management with Jacobs Engineering Group
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2C - Agreement - Boeing Access Road Over BNRR Bridge Rehabilitation Construction Management with Jacobs Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:45:45 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br /> BOEING ACCESS ROAD OVER BNRR BRIDGE REHABILITATION PROJECT <br /> Construction Support <br /> Project Objective and Project Description <br /> This project will provide preliminary and final design and construction engineering services to the City of <br /> Tukwila (CITY)for the rehabilitation of the South Boeing Access Road over BNSF/UPRR Bridge. The <br /> Boeing Access Road Bridge, originally constructed in 1944 and widened in 1965, is a five span bridge, <br /> three steel girder spans and two concrete T-beam spans, supported on concrete piers founded on H-pile <br /> foundation. <br /> The project will be accomplished in the following three phases: <br /> Phase 1— Bridge rehabilitation Alternatives Evaluation <br /> Phase 1 of the project is to assess bridge conditions and identify its deficiencies by conducting an in- <br /> depth bridge inspection. Seismic analysis will also be performed to identify seismic vulnerability of the <br /> bridge under current AASHTO design level earthquake (1,000-year return period). The findings and <br /> recommendations, along with associated costs, will be summarized in a Design Report. <br /> Phase 2—Final Design (PS&E) <br /> Upon approval of the Design Report by the CITY,the final construction documents(PS&E)will be <br /> prepared for the retrofit measures recommended and selected in Phase 1. The final design and the <br /> construction PS&E documents will be prepared in accordance with the City and WSDOT standards. <br /> Phase 3—Construction Support <br /> The CONSULTANT will assist the CITY with design services during construction of the Boeing Access Road <br /> over BNRR Bridge and preparing bridge load rating analysis after completion of the bridge construction. <br /> The details of the tasks are described below. <br /> Project Schedule <br /> The preliminary project schedule will be developed upon notice to proceed for the project and updated <br /> as changes occur.The anticipated major milestone dates are: <br /> Phase 2: To be completed January 2016 <br /> Phase 3: Notice to Proceed February 2017 <br /> Ad for Construction February 2017 <br /> Construction begin March 2017 <br /> Construction completion April 2018 <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.