Laserfiche WebLink
EXHIBIT E-2A <br /> Supplement No 4 <br /> City of Tukwila JA 'I , <br /> Fee Proposal <br /> South Boeing Access Road Bridge Rehabilitation Project-Design Services During Construction <br /> Non- Jacobs <br /> Project Sr.Str. Sr.Civil Contract Project Total Jacobs Cost Sub- <br /> Task Description Manager Eng. Eng. Des.Eng. CADD Admin Admin Hours by Task consultant <br /> 1 Project Management&Admin. 144 0 16 24 0 4 16 204 $17,200 <br /> 2 Engineering Services during Construction 88 130 92 878 80 0 0 1,268 $57,651 <br /> r'•� r -_ �Erc. _ r��r„t _,r•irr° ,-�: ,Ci �=v _ G7Y> <br /> 3 Environmental(Widener&Associates) 0 0 0 0 0 0 0 $44,718 <br /> 4 Bridge Load Rating(TranTech) 8 0 0 76 40 0 0 124 $4,999 <br /> $10,000 <br /> t .._ rr a? r <br /> Total Hours 232 130 108 902 80 4 16 1,472 <br /> Billing Rates-Negotiated Hourly (Estimated) $236.27 $155.00 $177.82 $79.61 $93.44 5116.81 $58.40 <br /> JACOBS Total Direct Labor $79,850 $54,718 <br /> Overhead(103.61%of Direct Labor) $82,733 <br /> Fee(30%of Direct Labor) $23,955 <br /> TOTAL LABOR COST $ 186,538 54,718 <br /> Direct Expenses (mileage,mailing,etc.) $1,000 <br /> Contingencies(10%) $18,700 <br /> EL Sub-total $206,238 <br /> TOTAL $260,956 <br /> Assumptions <br /> The budget is based on"cost+fixed fee”method. <br /> Mileage are paid at current federal allowed rate. <br /> The project duration is assumed for 16 months <br /> Ca UsersWmks!DesktoptTukwila Boeing!ScopinglDSDCBoeing Access Road Br_DSDC_draft 201701.09 7,912017 <br /> 17 <br />