City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2C - Agreement - Boeing Access Road Over BNRR Bridge Rehabilitation Construction Management with Jacobs Engineering Group
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2C - Agreement - Boeing Access Road Over BNRR Bridge Rehabilitation Construction Management with Jacobs Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:45:45 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br /> Scope of Work <br /> (Continued) <br /> prepare the bridge load rating report, including the summary sheet, in accordance with the current <br /> AASHTO Manual for Bridge Evaluation and WSDOT BDM and Bridge Inspection Manual. <br /> Assumptions: <br /> • The CITY'S CM Team will provide the bridge as-built drawings. <br /> • Bridge load rating will meet the new FHWA's SHV rating requirements. <br /> Deliverables: <br /> • Bridge load rating analysis reports (Two (2) hard-copy sets of the load rating, including load rating <br /> summary, analysis report, and other calculations (prepared in 8%"x 11" sized, "D" ring, "Quick <br /> Fit Brand View Binder") <br /> • Bridge Load Rating Summary(signed and sealed by a P.E. licensed in the State of Washington) <br /> • One (1)complete electronic file of the hard-copy set in PDF. <br /> • Posting/uploading of the load rating report into the WSBIS software once approved by the City. <br /> 4.2 As-Built Drawings <br /> The CONSULTANT shall prepare as-built plans at the substantial completion of the project based on <br /> the information provided by the Contractor and the Construction Management Team. All the <br /> changes occurred during construction will be shown in clouds with revision blocks on the original <br /> design files. <br /> Assumptions: <br /> ® The Contractor and/or Construction Management Team will provide the as-built information, <br /> including all the design changes during construction in the field, in a single set of redline plans. <br /> Deliverables: <br /> ■ As-Built Plans (2 hard copies and AutoCAD files in CD) <br /> SOW BAR DSDC 2017.01.09 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.