City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:47:13 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. The CONSULTANT will assist the CITY with any requests where field construction modifications or <br /> additions require field investigation and the written recommendation of a professional <br /> engineer. This task assumed four(4)modifications or additions. <br /> B. The Pavement Engineer will provide on-call pavement assistance as requested by the CITY. It is <br /> anticipated that this may include engineering support related to excavations for full-depth <br /> pavement repairs. This task assumes one(1)field visit. <br /> C. Post Repair Inventory Inspection: The CONSULTANT will perform an inventory inspection of the <br /> bridge after repairs are completed and will update the WSBIS database with inspection findings. <br /> The CONSULTANT will prepare an inspection report with photographs, inspection findings and <br /> repair recommendations. <br /> Deliverables: <br /> 1. Drawings,sketches,field notes, calculations,engineer reports, and other records as required. <br /> 2. Post repair inventory inspection report. <br /> 3. Update of information into WSDOT's WSBIS Bridge Management System program. <br /> 8.01.04 As-Built Record Drawings TranTecln <br /> The CONSULTANT shall prepare as-built record drawings at the completion of the project. The CITY will <br /> provide Contractor-prepared marked-up drawings, inspector's field notes, and other available <br /> information. The CONSULTANT shall use these materials to prepare the as-built record drawings. As-built <br /> record drawings shall be prepared in accordance with the CITY's"As-built Record Drawing Requirements." <br /> Deliverables: <br /> 1. As-built Record Drawings for Engineering Review(11"x17" bond [1 copy]and electronic pdf) <br /> 2. As-built Record Drawings,full size set, per CITY requirements <br /> 8,02 BEACON AVENUE U CONSTRUCTION ENGINEERING SUPPORT SERVICES <br /> 0.02.01 Project Mannageirnent <br /> Direction of CONSULTANT staff and review of their work over the course of the project shall be provided. <br /> This work element includes preparing monthly progress reports that include the status of individual work <br /> elements, number of meetings attended, outstanding information required, and work items planned for <br /> the following month. <br /> Monitoring of CONSULTANT'S budget will occur over the course of the project. This work element is <br /> intended to help monitor costs and budgets,and to propose corrective actions.These actions may include <br /> formal requests for increases, modifications, or reductions in scope and/or budget. <br /> Drawings and documents received and generated over the course of the project require review, <br /> coordination, and file management.The status of requested information will be maintained. <br /> Monthly Invoices/Progress Reports A-Beacon Avenue <br /> Monthly invoices will be prepared by CONSULTANT for work activities for the prior month per <br /> AGENCY reporting requirements.These invoices shall also include SUBCONSULTANT work and will <br /> be accompanied by monthly progress reports. Invoices will include back-up material for all <br /> expenses and will show approved budget and amount expended to date. <br /> Deliverables: <br /> 1. Monthly invoices and progress reports(12 assumed,time split among all three bridges). <br /> City of Tukwila 4 Scope of Services <br /> Major Maintenance on Three Bridges,Construction Engineering Support Services February 1,2017 <br /> 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.