City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:47:13 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® Monthly Invoices/Progress Reports <br /> Monthly invoices will be prepared by CONSULTANT for work activities for the prior month per <br /> AGENCY reporting requirements.These invoices shall also include SUBCONSULTANT work and will <br /> be accompanied by monthly progress reports. Invoices will include back-up material for all <br /> expenses and will show approved budget and amount expended to date. <br /> Deliverables: <br /> 1. Monthly invoices and progress reports(12 assumed,time split among all three bridges). <br /> 8.01.02 Construction Office Support Services-Frank Zepp T'r-anTech) <br /> The CONSULTANT shall provide Construction Office Support Services on an "on-call" basis at the CITY's <br /> request during the construction phase of the project. Construction Office Support Services may include <br /> the following: <br /> A. Pre-Construction Meetings: The CONSULTANT will attend one (1) pre-construction meeting. This <br /> may include the general pre-construction meeting with the prime contractor and subcontractors. <br /> B. Construction Meetings: The CONSULTANT will attend construction meetings as requested. This <br /> task assumes up to three (3) meetings attended by 2 to 3 staff depending on meeting agenda and <br /> Contractor's schedule of work. <br /> C. Review Selected Shop Drawings and Material Submittals: The CONSULTANT will review and <br /> recommend action on selected Contractor materials submittals, shop drawings, and material test <br /> reports as requested by the CITY. The effort for this task is for input/support of the review of shop <br /> drawings and materials submittals by the Contractor to the CITY. <br /> D. Requests for Information(RFIs): At the CITY's request,the CONSULTANT may be asked to provide <br /> assistance to the CITY in answering the Contractor's RFIs. <br /> E. Change Orders(COs):At the CITY's request,the CONSULTANT may be asked to provide assistance <br /> to the CITY in reviewing change order proposals, preparing independent change order cost <br /> estimate,and developing required information for COs.Work may include preparation of drawings <br /> and supporting information. <br /> F. Load Rating of Repaired Structure: The CONSULTANT will perform load rate calculations for the <br /> structure after work is completed and prepare a load rating report. <br /> Assumptions: <br /> 1. Material testing services are not included in this Scope of Work. <br /> 2. The CONSULTANT level of effort for Review of Shop Drawings, Material Submittals, RFI's and <br /> Change Orders is limited to hours shown in the fee proposal. <br /> Deliverables: <br /> 1. Shop drawing and material submittal reviews. <br /> 2. Responses to RFIs. <br /> 3. Drawings,calculations,and specifications required for change orders. <br /> 4. Load rating report and calculations. (hard copy and PDF copy with appropriate stamped, <br /> signed bridge rating summary sheet) <br /> 8.01.03 Construction Ftefrf Support Services (Tr•anTecfr) <br /> The CONSULTANT shall provide Construction Field Support Services on an "on-call" basis at the CITY's <br /> request during the construction phase of the project. <br /> City of Tukwila 3 Scope of Services <br /> Major Maintenance on Three Bridges,Construction Engineering Support Services February 1,2017 <br /> 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.