Laserfiche WebLink
TASK 7.0 ASSISTANCE DURING BID PERIOD <br /> The deliverables in Task 7.0 are revised as follows: <br /> 1. Prepare responses up to 10 bidder questions and develop up to 1 bid document addendum <br /> 2. Review of contractor's unit bid proposal <br /> 3. Prepare Reference check forms <br /> 4. Prepare pre-award letter <br /> 5. Prepare Letter of recommendation to award bid <br /> The intent of Task 7.0 was to provide support during the project bid period; pre-construction meetings <br /> occur after the bid period. <br /> TASK 8.0 CONSTRUCTION ENGINEERING SUPPORT SERVICES <br /> This work element provides for engineering design support and load rating services during the <br /> construction phase of the project. David Evans and Associates, Inc. (DEA) is also providing Construction <br /> Management Support Services as part of a separate Agreement.The Construction Management Support <br /> Services will be referenced as"CM" in this Scope. <br /> m01 PRANK ZEPP (S 1 BOTH STREET) CONSTRUCTION ENGINEERING SUPPORT <br /> SERVICES <br /> 8.01®01 Project Maiiageinient—(D EA AS ) <br /> Direction of CONSULTANT staff and review of their work over the course of the project shall be provided. <br /> This work element includes preparing monthly progress reports that include the status of individual work <br /> elements, number of meetings attended,outstanding information required, and work items planned for <br /> the following month. <br /> Monitoring of CONSULTANT'S budget will occur over the course of the project. This work element is <br /> intended to help monitor costs and budgets,and to propose corrective actions.These actions may include <br /> formal requests for increases, modifications,or reductions in scope and/or budget. <br /> Drawings and documents received and generated over the course of the project require review, <br /> coordination,and file management.The status of requested information will be maintained. <br /> SUBCONSULTANT Coordination. <br /> The following SUBCONSULTANT is anticipated to be used on this PROJECT: <br /> o TranTech Engineering LLC—Bridge Engineering <br /> CONSULTANT shall provide direction of the SUBCONSULTANT over the course of the project. <br /> Monthly monitoring of SUBCONSULTANT's budget will occur overthe course of the project.Status <br /> and projections will be developed. This work element is intended to help monitor costs and <br /> budgets, and to propose corrective actions. These actions could include formal requests for <br /> increases, modifications,or reductions in scope and/or budget. <br /> City of Tukwila 2 Scope of Services <br /> Major Maintenance on Three Bridges,Construction Engineering Support Services February 1,2017 <br /> 70 <br />