City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:47:13 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br /> 2017 to 2022 <br /> 91510406 <br /> PROJECT: Major Maintenance on 3 Bridges 2015 Project Nos. 91510407 <br /> 91510408 <br /> DESCRIPTION: Perform Seismic Retrofit, Deck and Joint Repair, and Bridge Painting work under the Local Agency Bridge <br /> Program on the Frank Zepp Bridge, Grady Way Bridge and the Beacon Avenue South Bridge. <br /> The three bridges were identified as good candidates for federal funding under the Local Agency Bridge <br /> JUSTIFICATION: Program administered by WSDOT. The proposed work will preserve the City owned infrastructure and <br /> extend the service lives of the bridges. <br /> STATUS: Federal grant funding was approved December 2014. Council budget amendment approved 8/3/15. <br /> MAINT. IMPACT: Maintenance needs will be reduced once these three major maintenance projects are completed. <br /> The three bridges were approved for grants under separate federal aid numbers but will be combined into <br /> COMMENT: one for the design&construction contract. Grant funding requires a 10% match for the design phase; <br /> projects that obtain construction authorization by 9/30/18 are eligible for 100% Federal construction funding. <br /> FINANCIAL Through Estimated <br /> in$000°s 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br /> EXPENSES <br /> Design 421 445 866 <br /> Land (R/W) <br /> 0 <br /> Const. Mgmt. 300 293 593 <br /> Construction 2,886 1,003 3,889 <br /> TOTAL EXPENSES 421 445 3,186 1,296 0 0 0 0 0 5,348 <br /> FUND SOURCES <br /> Fed BRAC Grant 379 401 3,186 1,296 5,262 <br /> Mitigation Actual 0 <br /> Mitigation Expected 0 <br /> City Oper. Revenue 42 44 0 0 0 0 0 0 0 86 <br /> TOTAL SOURCES 421 445 3,186 1,296 0 0 0 0 0 5,348 <br /> riN%- jai <br /> if <br /> 9 <br /> 64 <br /> 2017-2022 Capital Improvement Program 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.