City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:47:13 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Major Maintenance of 3 Bridges <br />Frank Zepp BHM- 1274(009), Beacon BHOS- <br />1320(004), Grady BHM- 1288(005) <br />Jacobs <br />individual reviewer scores <br />DEA <br />individual reviewer scores <br />Akana <br />individual reviewer scores <br />Max Score <br />Topics <br />Firm Structure <br />20 <br />27 <br />25 <br />28 <br />30 <br />24 <br />25 <br />29 <br />25 <br />30 <br />Project Manager <br />10 <br />17 <br />15 <br />19 <br />20 <br />14 <br />15 <br />19 <br />15 <br />20 <br />Team availability and schedule <br />5 <br />7 <br />5 <br />10 <br />10 <br />8 <br />5 <br />9 <br />7 <br />10 <br />presentation <br />10 <br />17 <br />12 <br />20 <br />20 <br />18 <br />20 <br />19 <br />16 <br />20 <br />response to questions <br />10 <br />17 <br />13 <br />20 <br />20 <br />13 <br />20 <br />19 <br />15 <br />20 <br />Totals <br />55 <br />85 <br />70 <br />97 <br />100 <br />77 <br />85 <br />95 <br />78 <br />100 <br />Average <br />70.00 <br />91.33 <br />86.00 <br />From each category, maximum score is shown on far right. Consultant with highest score (out of 100) was selected as the winning firm. <br />Review Staff: Steve Carstens, Scott Bates, Peter Lau. <br />Selection Date: 12/19/16 <br />Top Firm: DEA (David Evans and Associates, inc.) <br />Selection Justification: the selected firm demonstrated relevant bridge experience, had the best /most appropriately sized team for the project, demonstrated <br />intimate knowledge of the design, and has recent federal experience of similar sized structures. Based on the overall score /ranking, DEA prevailed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.