City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-02-28 Transportation and Infrastructure
>
TIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
2/23/2017 3:20:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT G-1 <br />KPG <br />CONSULTANT FEE DETERMINATION <br />SUMMARY OF COST <br />Tukwila Urban Center Package #1: Baker & Christensen Improvements <br />Classification <br />Senior E/LA <br />Project E/S <br />LA/Eng <br />Design Technician <br />Survey Crew <br />Office Admin. <br />Overhead (OH) Cost <br />OH Rate x DSC of <br />Fixed Fee (FF) <br />FF Rate x DSC of <br />Reimbursables <br />Mileage <br />Reprographics <br />Subcontract <br />(Blank) <br />Subtotal <br />Total Hours <br />X <br />Rate = <br />Cost <br />70.00 <br />X <br />$56.97 = <br />$3,987.90 <br />100.00 <br />X <br />$44.59 = <br />$4,459.00 <br />56.00 <br />X <br />$40.38 = <br />$2,261.28 <br />104.00 <br />X <br />$26.44 = <br />$2,749.76 <br />8.00 <br />X <br />$47.12 = <br />$376.96 <br />3.00 <br />X <br />$31.25 = <br />$93.75 <br />0.00 <br />X <br />= <br />$0.00 <br />0.00 <br />X <br />= <br />$0.00 <br />DSC Subtotal <br />$13,928.65 <br />136.21% <br />X <br />$13,928.65 = <br />$18,972.70 <br />30.00% <br />X <br />$13,928.65 = <br />$4,178.60 <br />(## Miles x $0.565/mile) <br />(## Sheets x $Xxx/sheet) <br />(Sub Name & Task) <br />(Allowance) <br />$175.00 <br />ISubconsultant Total: $37,254.95 <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.