City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-02-28 Transportation and Infrastructure
>
TIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
2/23/2017 3:20:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COST ESTIMATE: Tukwila Urban Center Package #1: Baker & Christensen Improvements <br />February 21, 2017 <br />1 <br />KPFF Consulting Enqineers <br />KPFF <br />Tukwila Urban Center Package #1: <br />Baker & Christensen Improvements <br />Prindpol Y Project Senior <br />Tech. <br />Specialist manager Engineer <br />S <br />Design <br />En <br />Engineer <br />Prof. Lord <br />Surveyor <br />U, <br />Project <br />Surveyor <br />Survey <br />C— <br />1AID <br />-hro, , <br />� Coordinate <br />I-nrim <br />MULTIPLIER: <br />7m7 SCOPE OF WORK <br />$64,48 $58.20 $45.00 <br />$38.08 <br />$42.00 <br />1 $32.00 <br />1 $65.00 <br />$33.00 <br />1 $27.30 <br />2.6752 <br />I Project Management and Administration <br />1.10 <br />�Ll 2. <br />Management, Coordination _&_ Invoicing — --- - ----- ----- - <br />Team Meetin gs <br />-- --- 2 --- <br />3 <br />a <br />6 <br />4 <br />$1,452 <br />$1,128 <br />Labor Subtotal:1 <br />5 1 0 1 0 <br />1 14 0 11 0 <br />1 0 <br />0 4 <br />$0 <br />2 Right-of-Way and Additional SurveyServices <br />2.10 Review Title Reports and update easements for Baker Blvd & Andover <br />Pprk g <br />Labor Subtotal: <br />0 1 0 1 0 <br />0 <br />0 <br />0 a <br />$0 <br />ww <br />3 Preparation of Contract Documents (PS&E) <br />3.10 <br />3.30 J <br />R,pa,kagl g Current Plans with Signal Modifications <br />Update Quantities, Cost Estimate & 6p,;off-ic--a-fkrms--- <br />Submittal Preparation (Draft Final & Final/Bid) <br />44 <br />32 -- <br />3 20 <br />50 <br />4 - 0 -- ----- <br />48 <br />61 <br />--l- 4 --- --1-- 4 <br />24 4 <br />$17,32.9 <br />$9,702 ... ... <br />$10,932 <br />Labor Subtotal: <br />3 96 1 0 <br />1 138 1 0 0 <br />0 <br />1 89 8 <br />$37,964 <br />747 <br />$0 <br />Labor Sum: <br />Reimbursable Sum: <br />8 1 96 0 152 0 0 <br />0 <br />JKPFF <br />89 12 <br />SUBTOTAL: <br />$40,544 <br />$0 <br />$40,544 <br />PAIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.