Laserfiche WebLink
EXHIBIT E-1 <br />KPFF Consulting Engineers <br />CONSULTANT FEE DETERMINATION <br />SUMMARY OF COST <br />Tukwila Urban Center Package #1: Baker & Christensen Improvements <br />Classification <br />Principal / Tech. Specialist <br />Project Manager <br />Senior Engineer <br />Design Engineer <br />Prof. Land Surveyor <br />Project Surveyor <br />Survey Crew <br />CADD Technician <br />Coordinator / Admin <br />Overhead (OH) Cost <br />OH Rate x DSC of <br />Fixed Fee (FF) <br />FF Rate x DSC of <br />Reimbursables <br />Mileage <br />Reprographics <br />Subcontract <br />(Blank) <br />Subtotal <br />Total Hours <br />X <br />Rate = <br />Cost <br />8.00 <br />X <br />$64.43 = <br />$515.44 <br />96.00 <br />X <br />$58.20 = <br />$5,587.20 <br />0.00 <br />X <br />$45.00 = <br />$0.00 <br />152.00 <br />X <br />$38.08 = <br />$5,788.16 <br />0.00 <br />X <br />$42.00 = <br />$0.00 <br />0.00 <br />X <br />$32.00 = <br />$0.00 <br />0.00 <br />X <br />$65.00 = <br />$0.00 <br />89.00 <br />X <br />$33.00 = <br />$2,937.00 <br />12.00 <br />X <br />$27.30 = <br />$327.60 <br />DSC Subtotal <br />$15,155.40 <br />137.52% <br />X <br />$15,155.40 = <br />$20,841.71 <br />30.00% <br />X <br />$15,155.40 = <br />$4,546.62 <br />(## Miles x $0.565/mile) <br />(## Sheets x $X.xx/sheet) <br />(Sub Name & Task) <br />(Allowance) <br />Subconsultant Costs (See Exhibit G) <br />$0.00 <br />$37,254.95 <br />IGRAND TOTAL: $77,798.6 <br />0111 <br />