Laserfiche WebLink
• All construction sites are inspected prior to start, during, and post construction. <br />This includes annual post - construction of all commercial and residential treatment <br />and flow control BMPs /facilities whereby maintenance responsibility, standards <br />and inspection procedures are addressed. <br />• The City has a long term Operations and Maintenance (O&M) program for host._ <br />constnxtion stormwater facilities and BMI1s that incftn de inspection, review, and <br />dock.dmentation. <br />• The City directs representatives of proposed new development and redevelopment <br />to the Department of Ecology's construction stormwater website: <br />http: / /www.ecy.wa.�4ov /programs /wq /stonuwater /construction /enoi.html and if <br />applicable make available to the representatives a "Notice of Intent (NOI) for <br />Industrial Activity ". <br />• Stiff' ( ^slpoiisibl(^ for innslir( ^a°tioTI any^ fillly and receive ongoing training in <br />erosion control, low impact development, stoi'TMA/atC,r, anrd nllirdated innsliC,C,ti0nn <br />t� ^a °lnnniga,n s. If s,,,cords oftnainninn ; any^ rnainntain( ^d and available,,, nllpon regal�st. <br />• Document and maintain records of all new development and redevelopment and <br />construction site activities, including inspections and enforcement actions. <br />• 1 lne City innco lino ate ^d into its a;o d( s, I�.l k S, standards, and <br />^nr(l:�n °a ^able doc1JITIC1ets, l,MA/ lrnaliM,"t Il)(, ^v(, ^loJP1,na(,;,nrt (V.11l:_ and IB(, ^nnt Mannag( ^rna( ^nnt <br />r naa °tia �,�u (IBMIPs) rnal(inn , V,III:_ and II: MIPs t1n(^ lirn( ^l nn( ^d na(,thod. Jlon dev( °Jolp1'Ylcnnt. <br />• Tlne City Will to train 1pentinr( ^nnt ( ^rn 1ploy(enn oil and IBMIps, In <br />addition, host 1...,11:: trraining events on the City'S W(,,,,b i e. <br />• C';n: rrently, King County has not selected Tukwila as a participant in the <br />watershed -scale stormwater planning process, consegk.wntly, no action regk.4ed, <br />5. M UN 11011 PAI., 0 PIERATI O S AND M I NTIENAN CIE <br />5.1 Permit Requirements <br />The Permit (Section S5.C.5) requires the City to: <br />• Implement an operations and maintenance program with the ultimate goal of <br />preventing or reducing pollutant runoff from the MS4 and municipal operations. <br />• Implement maintenance standards that are as or more protective, of facility <br />functions than those specified in Chapter 4 of Volume V of the 2012 Stogy inwater <br />Management Manual for Western Washington by December 31, 2016. <br />• Conduct annual inspections of all municipally owned or operated permanent <br />stormwater treatment and flow control BMPs /facilities, and conduct necessary <br />maintenance actions that will meet City adopted standards. <br />• Conduct spot checks, of City owned flow control and water quality facilities after <br />major storm events, and repair if needed or perform any necessary maintenance. <br />• Inspect all City owned catch basins and inlets at least once no later than August 1, <br />2017 and every two years thereafter. Clean catch basins if needed to comply with <br />maintenance standards. <br />• Maintain compliance with an established inspection program designed to inspect <br />all sites, achieving at least 95% of inspections per requirements of the Permit. <br />• Implement an operations and maintenance (O &M) program with the ultimate goal <br />of preventing or reducing pollutant runoff from all lands owned or maintained by <br />28 <br />