|
• All construction sites are inspected prior to start, during, and post construction.
<br />This includes annual post - construction of all commercial and residential treatment
<br />and flow control BMPs /facilities whereby maintenance responsibility, standards
<br />and inspection procedures are addressed.
<br />• The City has a long term Operations and Maintenance (O&M) program for host._
<br />constnxtion stormwater facilities and BMI1s that incftn de inspection, review, and
<br />dock.dmentation.
<br />• The City directs representatives of proposed new development and redevelopment
<br />to the Department of Ecology's construction stormwater website:
<br />http: / /www.ecy.wa.�4ov /programs /wq /stonuwater /construction /enoi.html and if
<br />applicable make available to the representatives a "Notice of Intent (NOI) for
<br />Industrial Activity ".
<br />• Stiff' ( ^slpoiisibl(^ for innslir( ^a°tioTI any^ fillly and receive ongoing training in
<br />erosion control, low impact development, stoi'TMA/atC,r, anrd nllirdated innsliC,C,ti0nn
<br />t� ^a °lnnniga,n s. If s,,,cords oftnainninn ; any^ rnainntain( ^d and available,,, nllpon regal�st.
<br />• Document and maintain records of all new development and redevelopment and
<br />construction site activities, including inspections and enforcement actions.
<br />• 1 lne City innco lino ate ^d into its a;o d( s, I�.l k S, standards, and
<br />^nr(l:�n °a ^able doc1JITIC1ets, l,MA/ lrnaliM,"t Il)(, ^v(, ^loJP1,na(,;,nrt (V.11l:_ and IB(, ^nnt Mannag( ^rna( ^nnt
<br />r naa °tia �,�u (IBMIPs) rnal(inn , V,III:_ and II: MIPs t1n(^ lirn( ^l nn( ^d na(,thod. Jlon dev( °Jolp1'Ylcnnt.
<br />• Tlne City Will to train 1pentinr( ^nnt ( ^rn 1ploy(enn oil and IBMIps, In
<br />addition, host 1...,11:: trraining events on the City'S W(,,,,b i e.
<br />• C';n: rrently, King County has not selected Tukwila as a participant in the
<br />watershed -scale stormwater planning process, consegk.wntly, no action regk.4ed,
<br />5. M UN 11011 PAI., 0 PIERATI O S AND M I NTIENAN CIE
<br />5.1 Permit Requirements
<br />The Permit (Section S5.C.5) requires the City to:
<br />• Implement an operations and maintenance program with the ultimate goal of
<br />preventing or reducing pollutant runoff from the MS4 and municipal operations.
<br />• Implement maintenance standards that are as or more protective, of facility
<br />functions than those specified in Chapter 4 of Volume V of the 2012 Stogy inwater
<br />Management Manual for Western Washington by December 31, 2016.
<br />• Conduct annual inspections of all municipally owned or operated permanent
<br />stormwater treatment and flow control BMPs /facilities, and conduct necessary
<br />maintenance actions that will meet City adopted standards.
<br />• Conduct spot checks, of City owned flow control and water quality facilities after
<br />major storm events, and repair if needed or perform any necessary maintenance.
<br />• Inspect all City owned catch basins and inlets at least once no later than August 1,
<br />2017 and every two years thereafter. Clean catch basins if needed to comply with
<br />maintenance standards.
<br />• Maintain compliance with an established inspection program designed to inspect
<br />all sites, achieving at least 95% of inspections per requirements of the Permit.
<br />• Implement an operations and maintenance (O &M) program with the ultimate goal
<br />of preventing or reducing pollutant runoff from all lands owned or maintained by
<br />28
<br />
|