City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
3/23/2017 1:14:25 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A -7 <br />3.9 Monthly Pay Requests: Assist City with monthly requests for payment, review with the City <br />and contractor and approve, as permitted. Utilize City provided format for pay estimates, or <br />Consultant format. The Utilities to provide quantities for payment for work associated with <br />Utility Schedules. <br />3.10 Certified Payroll: Process and track all certified payroll per WSDOT Highways & <br />Local Program Requirements. This includes verifying 30% of all payrolls submitted and tracking <br />payroll each week. Payroll and payroll logs will adhere to WSDOT LAG requirements. <br />11 Weekly Statement of Working Days: Prepare and issue weekly statement of working <br />day report each week. <br />3.12 Subcontractor Documentation: Process / approve all required subcontractor <br />documentation per WSDOT Highways & Local Program Requirements. This includes checking <br />System Award Management System (SAMS), verifying OM/WBE, verifying business licensing, <br />reviewing insurance documentation, verifying city business licensing, Intent to Pay Prevailing <br />Wage and Affidavit of Wages Paid. All subcontractor documentation will be logged into <br />WSDOT's subcontractor logs. <br />C. SUBMITTAL/RFI PROCESSING <br />3.13 Submittals: Coordinate review process for shop drawings, samples, traffic control <br />plans, test reports, and other submittals from the Contractor for compliance with the contract <br />documents. Key submittals to be transmitted to the City for their review and approval. <br />Submittals shall be logged and tracked. <br />3.14 Request for Information (RFI): Review and respond to RFI's. RFI's shall be logged <br />and tracked. <br />3.15 Record of Materials (ROM): With assistance from the inspector, utilize and maintain <br />the ROM according to WSDOT Highways & Local Program Requirements. The ROM will track <br />all of the materials delivered to the site including manufacturer /supplier, approved RAM's, QPL <br />items, material compliance documentation, and all other required documentation. <br />Deliverables <br />• Submittal log <br />• RFI Log <br />• Completed Record of Material for Material Certification <br />D. CHANGE MANAGEMENT <br />3.16 Change Orders: Develop change orders per Highway & Local Programs Guidelines <br />and City Standards, provide technical assistance to negotiate change orders, and assist in <br />resolution of disputes which may occur during the course of the project. A total of 40 hours have <br />been included in the cost for services. Each change order will be executed in accordance with <br />WSDOT Local Agency Guidelines and City Standards, and contain the following: <br />• Change order <br />• Independent Cost Estimate <br />• Time Impact Analysis <br />• Contractor's Pricing <br />• Verbal Approval Memo <br />• Change Order Checklist (LAG Manual) <br />S 1440 Street - Phase II KPG 40 <br />Supp 7- Construction Services 5 of 7 February 24, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.