City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
3/23/2017 1:14:25 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A -7 <br />• Change Order Request Form <br />• Back up documentation <br />3.17 Field Work Directives: Prepare field work directives as necessary to keep the contractor <br />on schedule. <br />3.18 Force Account: The inspector will track contractor force account labor, equipment and <br />materials. Provide payment according to WSDOT requirements. All force account calculations <br />will be verified by the engineer and double checked by the documentation specialist per WSDOT <br />LAG Manual. <br />Deliverables <br />• Change Order(s) <br />• Case Management Log <br />• RFI Log <br />• Minor Change Order(s) <br />• Force Account Records <br />TASK 4 — CLOSEOUT / RECORD DRAWING SERVICES <br />4.1 Record Drawings: Review record drawings prepared by the Contractor, and prepare a <br />conformed set of project record drawings based on Contractor provided information and from <br />inspection notes. Record drawings to be verified on a monthly basis, as part of the progress <br />payment to the Contractor. Upon project completion, contractor provided markups will be <br />verified for completeness and supplemented with inspection information. The Consultant will <br />prepare record drawings in AutoCAD format based on construction records provided by the <br />Contractor. Electronic and full size mylar record drawings will be provided to the City. <br />4.2 Punchlist oversight: Attend final walk through review with City staff. Field observation of <br />punchlist items will be by the City. <br />4.3 Physical Completion Letter: Following completion of all punchlist work, prepare physical <br />completion letter to the contractor, and recommend that City and /or Utilities accept the project. <br />Field observation of punchlist items will be by the City if Consultant budget is no longer <br />available. <br />4.4 Project Closeout: Transfer all project documents to the City for permanent storage. <br />• Meeting agendas and notes <br />• Monthly Pay Estimates <br />• WSDOT Reporting <br />• Subcontractor Packets <br />• Physical Completion Letter <br />• Final Project Documents <br />S 144fh Street - Phase II KPG 41 <br />Supp 7— Construction Services 6 of 7 February 24, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.