EXHIBITA <br />specifications. Coordinate with City for resolution of issues involving scope, schedule, and/or <br />budgetchanges. <br />D. Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, <br />and distribution of minutes toattendees. Outstanding issues tobe tracked ona weekly basis. <br />E. Knkdd Schedule Review: Perform detailed schedule review ofcontractor provided [PK4 for <br />conformance with the contract documents. <br />F. Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum <br />items. Review the Contract Price allocations and verify that such allocations are made in <br />accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for <br />payment each month will be calculated with detailed data. <br />G. 88unthh/ Pay Requests: Prepare monthly requests for payment, review with the City, <br />contractor and approve as permitted. Utilize City provided format for pay estimates, or <br />Consultant format. <br />H. Monthly Schedule Review: At the monthly cutoff, review contractor's updated schedule and <br />compare with field-observed progress, as described in Section 1-08 of the Special Provisions. <br />In addition, perform schedule analysis on contractor provided [PM updates and review <br />schedule for delays and impacts. Coordinate with Contractor in the development of recovery <br />schedules, as needed, to address delays caused by either events or issues within the <br />Contractor's control or other events or issues beyond the Contractor's control. <br />|. Certified Payroll: Process and track all certified payroll per State Prevailing Wage <br />Requirements. This includes verifying the initial payroll for compliance and 10Y6 of all payrolls <br />submitted thereafter. Tracking payroll each week. <br />J. Weekly Statement of Working Days: Prepare and issue weekly statement of working day <br />report each week. <br />K. Subcontractor Documentation: Process / Approve all required subcontractor documentation. <br />Request to Sublets will be verified and logged. This includes checking System Award <br />Management System (SAK4S), verifying business licensing, reviewing insurance <br />documentation, verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of <br />Wages Paid. All subcontractor documentation will be logged into KPG's subcontractor logs. <br />L Record Drawings' Review record drawings prepared by the Contractor, and prepare a <br />conformed set of project record drawings based on Contractor provided information and from <br />inspection notes. Record drawings to be verified on a monthly basis, as part of the progress <br />payment tothe Contractor. Upon project completion, contractor provided markups will be <br />verified for completeness and supplemented with inspection information. The Consultant will <br />provide the marked up plan sheets with both the contractors and inspectors as-built <br />information. Revisions to the CAD drawings will be based on these construction records. <br />M. Physical Completion Letter: Following completion of all punch|ist work, prepare physical <br />completion letter to the contractor, and recommend that City and/or Utilities accept the <br />project. <br />N. Project Closeout: Transfer all project documents to the City for permanent storage. <br />w <br />Schedule review comments <br />° <br />As-built schedule <br />~ <br />Meeting agendas and notes <br />� <br />Monthly Pay Estimates <br />Cascade View SRTI— Phase 2 Page 5uf8 KP6 <br />Construction Management Services 113117 <br />10 <br />