City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:22:51 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMMI-w- <br />Consultant Fee Determination <br />Project Name: <br />Consultant: <br />COST PLUS FIXED FEE <br />Classification <br />Project Manager <br />Project Engineer <br />Design Engineer <br />CAD Technician <br />Construction Inspector <br />Survey Crew <br />Document Specialist <br />Office Admin <br />Total Direct Salary Cost (DSC) <br />Overhead (131.49% x DSC) <br />Fixed Fee (30% x DSC) <br />City of Tukwila <br />Cascade View SRTS - Phase 2 <br />Supplement 2 - Construction Services <br />Hours <br />Rate <br />Cost <br />23 <br />$ <br />70.69 <br />$ <br />1,625.87 <br />324 <br />$ <br />51.00 <br />$ <br />16,524.00 <br />80 <br />$ <br />43.26 <br />$ <br />3,460.80 <br />16 <br />$ <br />29.50 <br />$ <br />472.00 <br />736 <br />$ <br />29.50 <br />$ <br />21,712.00 <br />0 <br />$ <br />58.00 <br />$ <br />- <br />260 <br />$ <br />46.75 <br />$ <br />12,155.00 <br />215 <br />$ <br />29.50 <br />$ <br />6,342.50 <br />1,654 $ 62,292.17 <br />r <br />'41 .10 M I Dews ;1� <br />$ 18,687-65 <br />Subtotal: $162,887.80 <br />Mileage $1,500 <br />Miscellaneous - Mileage, Repro, Field Supplies $1,000 <br />Subtotal: $2,500 <br />SUBCONSULTANT COSTS <br />Material Testing Allowance $15,000 <br />Subtotal: $15,000 <br />TOTAL <br />$ 180,387.80 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.