City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:22:51 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOUR AND FEE ESTIMATE <br />Project: City of Tukwila <br />Cascade View SRTS - Phase 2 <br />Supplement 2 - Construction Services <br />EXHIBIT B <br />Project Res(dent Design ".;; CAD "=�Const Survey ; Document: Docu <br />vlanager Enginoer ;:.:Engineer, I Technician r <`Inspector v .Grew Specialist <br />• Architecture • <br />1 nndsenpc Architecture <br />• Civil 1 iiginecring • <br />1 - Management, Coordination, Administration (Estimated duration 23 <br />Weekly level of effort by Classification 1 <br />Preconstruction Budget Estimate <br />23 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />23 <br />6,025.71 !, <br />2 - Preconstruction Services (Estimated duration 3 weeks) <br />Weekly level of effort by Classification <br />12 <br />16 <br />12 <br />Preconstruction Budget Estimate <br />0 <br />36 <br />0 <br />0 <br />48 <br />0 <br />36 <br />0 <br />12,904.53 <br />3 - Construction Services (Estimated duration 16 weeks) <br />Weekly level of effort by Classification <br />16 <br />40 <br />10 10 <br />Construction Period Budget Estimate 0 <br />256 <br />64 <br />0 <br />640 <br />0 <br />160 <br />160 <br />122,650.94 <br />4 - Closeout/Record Dwg Services (Estimated duration 4 weeks) <br />Weekly level of effort by Classification 0 8 4 4 12 <br />16 <br />Closeout / Record Dwg Budget Estimate <br />0 <br />32 <br />16 <br />16 <br />48 <br />0 <br />64 <br />32 <br />21,306.62 <br />Subtotal - 'Labor <br />Reimbursables & Subconsultants <br />23 " ' -324 80 16 736 1 , 0 260 215 $ 162,887.80 <br />Material Testing Allowance $ <br />Mileage $ <br />Miscellaneous - Mileage, Repro, Field Supplies $ <br />15,000.00 <br />1,500.00 <br />1,000.00 <br />Subtotal - Reimbursables <br />$ 17,500.00 II <br />Total Project Budget <br />180,387.80 <br />3/2/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.