City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-09 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-05-09 Transportation and Infrastructure
>
TIC 2017-05-09 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:48 PM
Creation date
5/4/2017 1:45:37 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/09/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A -1 <br />40th — 42 "d Ave S. Phase III <br />City of Tukwila <br />Amendment 7 <br />Scope of Work <br />The scope of work is amended as follows: <br />General Assumptions <br />Work described in the original contract and subsequent amendments 1 through 6 has been <br />completed. This includes the preparation of Bid documents and services during bidding. This <br />amendment is for services during the construction phase. <br />The contract date shall extend to June 30, 2018 <br />TASK 1 <br />1. Project Management <br />Additional project management is required for the preparation of progress reports and invoicing. <br />The additional duration for purposes of project management is assumed to be 12 months. This <br />assumes that we will on bill bi- monthly during the winter construction shutdown. <br />Deliverables: <br />• Monthly progress reports and invoices (12) <br />TASK 13 <br />13. Services During Construction (New) <br />The City is responsible for the day to day management of the construction contractor. <br />CONSULTANT will provide the following support to the City during construction. <br />13.1 Services During Construction <br />The CONSULTANT will support the CITY throughout the construction by providing design <br />clarification, reviewing Contractor submittals, and providing responses to the Contractor's <br />requests for information. <br />This task effort is limited to the hours shown in the attached fee determination sheet. <br />The CONSULTANT will provide written responses to the Contractor's request for interpretation <br />or clarification of the contract documents. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.