Laserfiche WebLink
40th - 42ND Avenue South - Phase III <br />City of Tukwila <br />V. Assumptions <br />a. Staffing levels are anticipated in accordance with the attached budget estimate (Exhibit <br />B). <br />b. The level of effort required will not exceed the approved budget without prior approval <br />by City. The approved budget is based upon a 165 Working Day construction contract <br />with zero (0) Unworkable Days. Work is anticipated to begin construction in June 2017. <br />Should further services be required, or should construction run longer than this time <br />period, and if costs exceed the approved budget, the City will negotiate a supplement to <br />this Agreement. <br />c. The City will provide field office, intemet aeeess, p ntin g and seanning Gapabi�and <br />arl<in for field personnel. <br />d. Consultant has the authority to shift budget between work tasks provided the overall <br />project budget remains unchanged. <br />e. Project closeout will be completed within 30 calendar days following issuance of <br />®substantial completion. Should further services be required, or should closeout run <br />longer than this time period, and if costs exceed the approved budget, the City will <br />negotiate a supplement to this Agreement. <br />.4. Items and Services City will provide: <br />i. All construction survey is provided by the Contractor,, exceef...t. p„ „ 1,. „u .f. „ 8 II2Y <br />the City foir the ConaulR&nt.to ll2lacv „ilcle flu6„cl vei lficatuon Field verification <br />su_rvy costs are not included in the budget. If costs exceed the approved <br />budget, the City will negotiate a supplement to this Agreement. <br />ii. The City will provide the Record of Materials (ROM) assembled by WSDOT „N„ <br />�, i Iles the City a 2ggli ass the COIiSLflltant to Il2.�! Iggt1 ei the If:10M foir this <br />t011ISto UCtl0il ...o f. If __ <br />_preconstruction costs exceed the approved budget <br />.... prO� to <br />because of additional time required for ROM assembly, the City will negotiate a <br />supplement to this agreement. <br />I q,, Design by Others: It is understood and agreed that the Consultant did not <br />prepare the Contract Documents for the project, and the City will provide the <br />Consultant the support of the Engineer -of- Record during the course of the <br />Consultant's work. The City is responsible for managing the Design Team. <br />gh Vehicle usage will be billed at an hourly rate for those working on <br />the project requiring usage of vehicle as estimated in EXHIBIT B. <br />Page 6 of 6 Updated: 5/3/2017.&4A244-7 7 29 <br />