City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-09 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-05-09 Transportation and Infrastructure
>
TIC 2017-05-09 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:48 PM
Creation date
5/4/2017 1:45:37 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/09/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINANCIAL Through Estimated <br />(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: <br />Gilliam Creek 42 Ave S Surface Water Culvert Project No. 99410303 <br />99341208 <br />Design and replace the 36 -inch surface water culvert under 42 Ave S /Gilliam Creek. Combining this project <br />DESCRIPTION: <br />with the Residential Street Project 42nd Ave S Phase III. <br />144 <br />The existing concrete pipe sections are separating and cracked which could erode the 42 Ave S fill and <br />JUSTIFICATION: <br />lead to loss of roadway. <br />STATUS: <br />Project is currently under design with construction scheduled to begin in 2017. <br />MAINT. IMPACT: <br />Expected to decrease maintenance. <br />State Fish & Wildlife hydraulic project approved (HPA) permit will be required. Replacement will require <br />COMMENT: <br />a fish passable structure. <br />FINANCIAL Through Estimated <br />(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Design <br />144 <br />31 <br />175 <br />Land (R /W) <br />0 <br />Const. Mgmt. <br />135 <br />15 <br />150 <br />Construction <br />8 <br />900 <br />100 <br />1,008 <br />TOTAL EXPENSES <br />152 <br />31 <br />1 1,035 <br />1 115 <br />1 0 <br />0 <br />0 <br />0 <br />0 <br />1,333 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />152 <br />31 <br />1,035 <br />115 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1,333 <br />TOTAL SOURCES <br />152 <br />31 <br />1 1,035 <br />1 115 <br />1 0 <br />0 <br />0 <br />0 <br />0 <br />1,333 <br />2017 - 2022 Capital Improvement Program 100 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.