Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: <br />Boeing Access Rd over BNRR Bridge Rehabilitation Project No. 99410408 <br />Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 6 lanes <br />DESCRIPTION: <br />and have a sidewalk on one side. <br />The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete <br />JUSTIFICATION: <br />spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet <br />current bridge standards. <br />1,249 <br />Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal <br />STATUS: <br />grant applications were submitted in 2008 and 2010 and the bridge rehabilitation was successful for <br />funding in 2012 for federal bridge funds. A Public Works Trust Fund (PWTF) loan was rescinded in 2013. <br />MAINT. IMPACT: <br />Maintenance will be reduced. <br />COMMENT: <br />Bridge will be rehabilitated in phases to allow continued traffic use. Federal bridge grant of $9,745,600 <br />Land(R/W) <br />requires a 20% local match. A bond issue for the City match was issued in 2015 with the Interurban Ave S. <br />FINANCIAL Through Estimated <br />(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAI <br />EXPENSES <br />Design <br />1,249 <br />104 <br />1,353 <br />Land(R/W) <br />100 <br />100 <br />Const. Mgmt. <br />1,124 <br />1,124 <br />Construction <br />9,745 <br />9,745 <br />TOTAL EXPENSES <br />1,249 <br />204 <br />10,869 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />12,322 <br />FUND SOURCES <br />Awarded Grant <br />905 <br />163 <br />8,677 <br />9,745 <br />Proposed Grant <br />0 <br />Fund Balance -Bond <br />344 <br />41 <br />2,192 <br />2,577 <br />Mitigation <br />0 <br />City Oper. Revenue <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />TOTAL SOURCES <br />1,249 <br />204 <br />1 10,869 <br />1 01 <br />0 <br />0 <br />01 <br />0 <br />0 <br />12,322 <br />.` Project Location N <br />y� P <br />A GJ r� e—m <br />BOIn CGE <br />j> 4 y p D <br />S1 2St <br />- -- 77f <br />1>A <br />n a <br />St <br />i j �a <br />S d+ <br />Iti <br />2017 - 2022 Capital Improvement Program 10 <br />2 <br />