City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-23 Item 2C - Agreement - 42nd Avenue South Phase III (Southcenter Boulevard to South 160th Street) with King County Water District #125
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-05-23 Transportation and Infrastructure
>
TIC 2017-05-23 Item 2C - Agreement - 42nd Avenue South Phase III (Southcenter Boulevard to South 160th Street) with King County Water District #125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:49 PM
Creation date
5/19/2017 9:47:46 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/23/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Allan Ekberg, Mayor <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Bob Giberson, Public Works Director - f <br />BY: Cyndy Knighton, Senior Program Manager <br />CC: Mayor Ekberg <br />DATE: May 19, 2017 <br />SUBJECT: 42nd Avenue S Phase III (Southcenter Blvd to S 160th St) <br />Project No. 99410303 <br />Interlocal Agreement with King County Water District #125 <br />ISSUE <br />Approve an Interlocal Agreement (ILA) with King County Water District #125 (KCWD #125) for reimbursement <br />of costs for sewer relocation work to be constructed by Active Construction, Inc. for the 42nd Avenue S Phase III <br />project. <br />BACKGROUND <br />In February 2012, CH2M Hill began design work on a project that combined the 42nd Ave S Phase III <br />(Southcenter Blvd to S 160th St) roadway improvements and the Gilliam Creek culvert replacement project. The <br />project included significant coordination with outside utility providers. KCWD #125 has designed water main <br />relocations to accommodate the City's project and the project was bid with a separate schedule for the KCWD <br />#125 work. <br />ANALYSIS <br />The 42nd Avenue S project has been awarded to Active Construction, Inc. and bid schedule E includes all the <br />work designed by KCWD #125 for the required water main relocation. The attached ILA provides the necessary <br />mechanism for Tukwila to complete the construction of the KCWD #125 work and get reimbursed for the costs. <br />The ILA includes reimbursement to Tukwila for the actual construction work as well as a percentage of the <br />construction cost (8 %) to offset construction management (CM) costs. The typical 8 -10% of CM costs is not <br />used because Tukwila is not responsible for inspection of the water installation as KCWD #125 is providing <br />staffing for inspections. <br />FINANCIAL IMPACT <br />Ultimately there is no financial impact to Tukwila for the ILA. The contractor will be paid using Tukwila funds, but <br />the water main relocation costs are fully reimbursed to the City. Actual costs, once known, are what will be <br />charged to KCWD #125 and not the estimated costs included in the agreement language. The anticipated <br />maximum reimbursement to Tukwila is $289,841.33, which includes a 20% contingency. There are provisions <br />for more should it become necessary, although KCWD #125 approval would be required. <br />RECOMMENDATION <br />Council is being asked to approve the Interlocal Agreement with King County Water District #125 for the 42nd <br />Ave S Phase III Project and consider this item on the Consent Agenda at the June 5, 2017 Regular Meeting. <br />Attachment: Interlocal Agreement between City of Tukwila and King County Water District #125 <br />w:fpw eng\projects�a- rw & rs projects \42nd ave s phase iii (99410303 94 -rs03) \construction\ #.200 - correspondence \005 - utility & interlocal coordination \info memo - ila with kcwd sm.docx 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.