City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-23 Item 2C - Agreement - 42nd Avenue South Phase III (Southcenter Boulevard to South 160th Street) with King County Water District #125
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-05-23 Transportation and Infrastructure
>
TIC 2017-05-23 Item 2C - Agreement - 42nd Avenue South Phase III (Southcenter Boulevard to South 160th Street) with King County Water District #125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:49 PM
Creation date
5/19/2017 9:47:46 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/23/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTERLOCAL AGREEMENT BETWEEN <br />KING COUNTY WATER DISTRICT NO. 125 AND <br />THE CITY OF TUKWILA REGARDING UTILITY RELOCATION <br />THIS INTERLOCAL AGREEMENT ( "Agreement ") is made and entered into by and between <br />King County Water District No. 125, a Washington municipal corporation ( "District "), and the <br />City of Tukwila, a Washington municipal corporation ( "City "), (individually a "Party" and <br />collectively the "Parties "). <br />WHEREAS, the Tukwila City Council has authorized the 42nd Avenue South Phase III (Project <br />No. 99410303) improvement/transportation project in an area with mixed zoning, both high and <br />low density residential; and <br />WHEREAS, the City intends to construct storm drainage improvements within the right of way of <br />42nd Avenue South as part of the Project; and <br />WHEREAS, Tukwila has determined that its street improvement project is a public project and <br />will necessitate the relocation and new construction of District utility infrastructure located within <br />the boundaries of the project; and <br />WHEREAS, the District has a water main and appurtenances located within the right of way of <br />42nd Avenue South that conflict with the planned alignment of the City project; and <br />WHEREAS, the City requires that the District relocate existing utilities at District cost when <br />planned City roadway infrastructure conflicts with District infrastructure; and <br />WHEREAS, it is mutually beneficial to both Parties to have the utility relocation and project <br />construction take place concurrently utilizing one contractor to reduce overall costs and traffic <br />related impacts; and <br />WHEREAS, the Parties desire to have the City serve as the lead agency for the project to <br />provide final design, advertisement, award, construction, inspection, and contract administration <br />for the project. <br />NOW THEREFORE, in consideration of the terms and conditions contained herein, the Parties <br />agree as follows: <br />AUTHORITY <br />This Agreement is entered into pursuant to Chapter 39.34 RCW, the Interlocal <br />Cooperation Act. <br />PURPOSE <br />The Parties agree to engage in a joint project that will construct street, utility and culvert <br />improvements along 42nd Avenue South as described generally in the plan set titled, <br />"40th -42nd Avenue South — Phase III, Project No. 99410303 and 99341208, dated March <br />17, 2017" which are hereby incorporated herein by this reference and made part hereof <br />( "Project "). <br />W: \PW Eng \PROJECTSW- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90% \COT - KCWD #125 - Interlocal Agreement <br />42nd Ave S Final.docx -1- <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.