Section 9. Electrical permit fees will be charged according to the following
<br />lit"dule:
<br />1. NEW SINGLE-FAMILY DWELLINGS
<br />------ . . . .... ---------------------------
<br />New single-family dwellings (including a garage) $155.91 + Technology Fee
<br />.111"'"" ............ .................. -
<br />Garages, pools, spas and outbuildings $83.54 + Technology Fee
<br />..... ...... .A....._...... .... ................... . ... . .......... . . .. .... . . .................. . . . . ....... .
<br />Low voltage systems $61.05 + Technology Fee
<br />.... . ............... . ...... . - ............... - - . . . . . ................ .
<br />2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
<br />..... .. ......... ......... ........
<br />Service change or alteration-no added/altered circuits $83�54 + Technology Fee
<br />.L
<br />---------------- ....... .
<br />Sei .. -
<br />change $83.54 with added/altered circuits, plus $1'2.00 for $83.54 + Technology Fee
<br />each added circuit (maximum perrnLit fee . �I�§,qq)
<br />ircuits added/altered without service change (includes up to $55.69 + Technology Fee
<br />. .... ------ - --------- .............................. . ..
<br />Circuits 55.69 added/altered without service change (more than $55.69 + Technology Fee
<br />5 circuits); $7.65 for each added circuit (maximum permit fee $100,00
<br />+ Technolo y Fee) - - ----------- - - ----- -------- ------------------------------ ----- - - . ......... ' ----------- - — -- - --- - ------ - -- ---
<br />Meter/mast repair $69,62 + Technology Fee
<br />...............
<br />Low voltage systems + Technology Fee
<br />- -------------- . ............................................. ........ . .... . . . ............ . . ............. ...... . . . ................. .......... . . .... . ------
<br />3, MULTI-FAMILY AND COMMERCIAL (including low voltage)
<br />Valuation of
<br />Work (Total Permit Fee
<br />. ........ . Contract Amount
<br />$250 or less $66.30 + Technology Fee
<br />$251 - $1,000 $66.30 for the first $250 plus $,4.39 for each $100 or fraction thereof, to and
<br />jqcluq!q $1,000,, + Technology Fee
<br />$1,001 - $5,000 $98.94 for the first $,1,000 plus $22,03 for each $1,000 or fraction thereof, to
<br />and including,$5,000, + Technology Fee
<br />$5,001 - $50,000 $186.97 for the first $5,000 plus $18.05 for each $1,000 or fraction thereof, to
<br />and including $50,000, + Tech nqIo9.y_ft(L_
<br />$50,001 - $250,000 $998.73 for the first $50,000 plus- $13.16 for each $1,000 or fraction thereof, to
<br />and including $250,000, + Technology Fee
<br />$250,001 - $ f,666 0-60— $3,638,54 for the first $2501,000 plu-s- $9.33 for each $1,000 or fraction thereof,
<br />to and including $1,000,000, + TechDp!qgy Fee.....
<br />Over $1,000,000 $10,649.51 plus 0.5% of cost over $1,000,000, + Technology Fee
<br />WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
<br />NG:bjs Page 9 of 11
<br />11
<br />
|