Laserfiche WebLink
Section 9. Electrical permit fees will be charged according to the following <br />lit"dule: <br />1. NEW SINGLE-FAMILY DWELLINGS <br />------ . . . .... --------------------------- <br />New single-family dwellings (including a garage) $155.91 + Technology Fee <br />­.­11­1"'­"­"­­ ............ .................. - <br />Garages, pools, spas and outbuildings $83.54 + Technology Fee <br />..... ...... .A....._...... .... ................... . ... . .......... . . .. .... . . .................. . . . . ....... . <br />Low voltage systems $61.05 + Technology Fee <br />.... . ............... . ...... . - ............... - -­ . . . . . ................ . <br />2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES <br />..... .. ......... ......... ........ <br />Service change or alteration-no added/altered circuits $83�54 + Technology Fee <br />.L <br />---------------- ....... . <br />Sei .. - <br />change $83.54 with added/altered circuits, plus $1'2.00 for $83.54 + Technology Fee <br />each added circuit (maximum perrnLit fee . �I�§,qq) <br />ircuits added/altered without service change (includes up to $55.69 + Technology Fee <br />. .... ------ - --------- .............................. . .. <br />Circuits 55.69 added/altered without service change (more than $55.69 + Technology Fee <br />5 circuits); $7.65 for each added circuit (maximum permit fee $100,00 <br />+ Technolo y Fee) - - ----------- - - ----- -------- ------------------------------ ----- - - . ......... ­­'­ ----------- - — -- - --- - ------ - -- --- <br />Meter/mast repair $69,62 + Technology Fee <br />............... <br />Low voltage systems + Technology Fee <br />- -------------- . ............................................. ........ . .... . . . ............ . . ............. ...... . . . ................. .......... . . .... . ------ <br />3, MULTI-FAMILY AND COMMERCIAL (including low voltage) <br />Valuation of <br />Work (Total Permit Fee <br />. ........ . Contract Amount <br />$250 or less $66.30 + Technology Fee <br />$251 - $1,000 $66.30 for the first $250 plus $,4.39 for each $100 or fraction thereof, to and <br />jqcluq!q $1,000,, + Technology Fee <br />$1,001 - $5,000 $98.94 for the first $,1,000 plus $22,03 for each $1,000 or fraction thereof, to <br />and including,$5,000, + Technology Fee <br />$5,001 - $50,000 $186.97 for the first $5,000 plus $18.05 for each $1,000 or fraction thereof, to <br />and including $50,000, + Tech nqIo9.y_ft(L_ <br />$50,001 - $250,000 $998.73 for the first $50,000 plus- $13.16 for each $1,000 or fraction thereof, to <br />and including $250,000, + Technology Fee <br />$250,001 - $ f,666 0-60— $3,638,54 for the first $2501,000 plu-s- $9.33 for each $1,000 or fraction thereof, <br />to and including $1,000,000, + TechDp!qgy Fee­­....­­. <br />Over $1,000,000 $10,649.51 plus 0.5% of cost over $1,000,000, + Technology Fee <br />WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 <br />NG:bjs Page 9 of 11 <br />11 <br />