City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
FIN 2017-06-20 Item 2A - Resolution - Consolidated Permit Fee Schedule: Credit Card Surcharge Requirements
COT-City
>
City Clerk
>
Council Committees
>
Finance (2017-2020)
>
Finance Agenda Packets (2017-Present)
>
2017-06-20 Finance
>
FIN 2017-06-20 Item 2A - Resolution - Consolidated Permit Fee Schedule: Credit Card Surcharge Requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:13:09 PM
Creation date
6/15/2017 1:28:33 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/20/17
Committee Name
Finance 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 10. Other inspections and fees will be charged according to the following <br />schedule: <br />OTHER INSPECTIONS AND FEES <br />Inspections outside of normal business hours (three hour minimum charge) <br />-- - - --------------------------- ---- - ----- ----------- -- - -- <br />$102.00/hour <br />Re-inspection fee <br />---- - . ........... .... . ... ... <br />$67,83/hour <br />Inspection for which no fee is specifically indicated—investigations or safety <br />.............. <br />$67,83/hour <br />ins•ec tions I <br />Additional plan review required by changes, additions, or revisions to approved <br />$67. 83/hour <br />nimum �i;h <br />_pLans_(rr� <br />Work commencing before permit issuance shall be subject to an investigation fee <br />100% of the permit fee <br />_ip _g <br />Plan review fee—Mechanical, P6"r biin" g F u 6_1 G a i r a n-di <br />for review shall be 25% of the total calculated permit fee. The plan review fee is a <br />separate fee from the permit fee and is required when plans are required in order <br />to document com liance with the code, <br />................ _ .......... _ ...... . ...... .. . ...... ... ..... ... ... . . .......................... .... ..... . ... . . .. . . ............................ <br />ork covered without inspection or work not ready at the time of inspection may <br />_'be ch.a.rg.e.d...a fe._.ins�pection fee of $66.50. <br />------- ... <br />Expired permit final - includes two inspections <br />$133.00 <br />. . . .. .. ...... .......................................... . .. <br />p add pe o <br />Exired permit final - each itional insctin <br />. ...... . ....... . . . . . ......... . . ............. I <br />6 8 <br />Minor residential remodel plan review and permit (projects up to $20,000) <br />.......... . . .. <br />$20.00 <br />Section 11. Credit Card Surcharge. If payment is made by credit card, a <br />processing fee of 3% will be added to the total ord�er. N 1__,_fee-w4-be-*�9ed <br />WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 <br />NG bjs Page 10 of 11 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.