Laserfiche WebLink
Just past the school entrance are 13 parking spaces available to the north of the drive aisle. <br />Along the west edge of the site north of the parking lot is a bus loop. <br />The school building is oriented on the site at an angle, with the entry facing south and slightly <br />west. Play areas for infants, pre- kindergarten and kindergarten are separate areas whose <br />locations correspond with their classroom spaces. Infants' outdoor space is located adjacent to <br />the infant rooms on the east side of the single -story building forming the front fapade. Slightly <br />north of the infant play area is covered and uncovered outdoor play space for pre - kindergarten <br />students, hugging the eastern classroom wing. Kindergartens have an open lawn play area at <br />the parcel's northwest corner, with covered and uncovered play areas on asphalt closer to the <br />school building. This asphalt play area can be used as a fire lane in case of emergencies. <br />The entire school site will be fenced in chain link; a sliding security gate will run along the <br />western property line above the entrance to the site and will be closed when school is not in <br />session. Additionally, chain link fencing will be installed at the southeast corner of the school <br />between the outdoor infant play area and the parking lot, and again between the end of the bus <br />loop and the kindergarten play yard. <br />Landscaping <br />Type I perimeter landscaping is proposed for the western and northern edges of the <br />developable area. The parking lot will be landscaped with islands and a continuous planting <br />strip of lawn between the principal parking area and the school entry. No changes are proposed <br />to the steep slope area on the eastern portion of the parcel, covered with mixed, native <br />vegetation. <br />Offsite Improvements <br />The School District will make several improvements to transportation infrastructure near the site. <br />A sidewalk, pedestrian lighting, and vehicular turnaround immediately west of the school site on <br />the church easement and private drive will be among the improvements planned. Also planned <br />14 <br />16 <br />t <br />�w.. <br />Ax R <br />t auVw <br />f f <br />�..k <br />4 � <br />q- <br />n... <br />v. _k .MGpaw <br />@ S 3II 6P <br />The school building is oriented on the site at an angle, with the entry facing south and slightly <br />west. Play areas for infants, pre- kindergarten and kindergarten are separate areas whose <br />locations correspond with their classroom spaces. Infants' outdoor space is located adjacent to <br />the infant rooms on the east side of the single -story building forming the front fapade. Slightly <br />north of the infant play area is covered and uncovered outdoor play space for pre - kindergarten <br />students, hugging the eastern classroom wing. Kindergartens have an open lawn play area at <br />the parcel's northwest corner, with covered and uncovered play areas on asphalt closer to the <br />school building. This asphalt play area can be used as a fire lane in case of emergencies. <br />The entire school site will be fenced in chain link; a sliding security gate will run along the <br />western property line above the entrance to the site and will be closed when school is not in <br />session. Additionally, chain link fencing will be installed at the southeast corner of the school <br />between the outdoor infant play area and the parking lot, and again between the end of the bus <br />loop and the kindergarten play yard. <br />Landscaping <br />Type I perimeter landscaping is proposed for the western and northern edges of the <br />developable area. The parking lot will be landscaped with islands and a continuous planting <br />strip of lawn between the principal parking area and the school entry. No changes are proposed <br />to the steep slope area on the eastern portion of the parcel, covered with mixed, native <br />vegetation. <br />Offsite Improvements <br />The School District will make several improvements to transportation infrastructure near the site. <br />A sidewalk, pedestrian lighting, and vehicular turnaround immediately west of the school site on <br />the church easement and private drive will be among the improvements planned. Also planned <br />14 <br />16 <br />