Laserfiche WebLink
is the development of the missing link of S. 142nd Street, from 43rd Ave S. to 44th Ave S. <br />Currently a dirt and gravel pedestrian -only trail, the section of undeveloped right -of -way will be <br />developed with a 23' wide, two -way asphalt driving surface and a 6" curb and 6' wide sidewalk <br />to the south. <br />PUBLIC COMMENTS <br />A community open house was held at Foster High School from 5:30- 7:30pm on January 19th, <br />2017 to discuss all the Tukwila School District projects funded by the bond measure including <br />the Foster High expansion and construction of the B2K campus. District consultants gave a <br />presentation and overview of projects, and attendees were encouraged to walk around the room <br />to view design renderings and ask questions of the consultant architects and engineers, or of <br />City staff who were also available to discuss the projects and process with community <br />members. <br />One public comment on the District's SEPA issuance was received via email from Jonathan <br />Joseph on May 22, 2017, and included in this report as Attachment G. His concerns include <br />neighborhood inconvenience during pickup and drop -off times due to a reduction in onsite <br />parking, stormwater runoff, tree health at Foster, and the purpose behind the projects. <br />15 <br />17 <br />