City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-06-27 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-06-27 Transportation and Infrastructure
>
TIC 2017-06-27 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:50 PM
Creation date
6/22/2017 10:31:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/27/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY CJFTUKVVLACAPITAL PROJECT SUMMARY <br />zon to 2022 <br />PROJECT: Storm Water Quality Retrofit Program Project No. 91241202 <br />DESCRIPTION: Design and install water quality improvements at selected drainage locations throughout the City. <br />JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated. <br />STATUS: Additional water quality is being added to Interurban Ave S in 2015 and 53rd Ave S in 2017. <br />MA|N'[|MPACT: Expected to increase maintenance. <br />COMMENT: Combine with other C|P projects for design and construction, where feasible. <br />FINANCIAL Through EnUmuwsd <br />fin $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Design <br />9 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />129 <br />Const. Mgmt. <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />120 <br />Construction <br />80 <br />80 <br />80 <br />80 <br />80 <br />80 <br />80 <br />80 <br />640 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />9 <br />110 <br />110 <br />110 <br />110 <br />110 <br />110 <br />110 <br />110 <br />889 <br />TOTAL SOURCES <br />91 <br />110 <br />110 <br />1 110 <br />1 110 <br />1 110 <br />110 <br />1 110 <br />1 110 <br />889 <br />2017 uocz Capital Improvement Program 97 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.