Laserfiche WebLink
CITY OF TUKWILA <br />DEPARTMENT OF PUBLIC WORKS <br />2017 Overlay <br />BID TABULATION <br />Tukwila Project # 90610401 <br />.SL\i rl.t . tnr_O;NAA <br />July 13, 2017 <br />Engineer's Estimate <br />kCP»� DA e vev 1 0 �00 7±I f;Ita <br />�` �afiia <br />�� <br />f ekls bf1'W4DB <br />Lakeridge Paving Company, LLC <br />No. <br />ROADWAY <br />Section No. <br />(SCHEDULE <br />Item <br />B) <br />Qtv <br />Unit <br />Unit Cost <br />Total Cost <br />Unit Cost <br />Total Cost <br />Unit Cost <br />Total Cost <br />36 <br />1 -04 <br />Unexpected Site Changes <br />1 <br />FA <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />37 <br />1 -07 <br />SPCC Plan <br />1 <br />LS <br />$ 400.00 <br />$ 400.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 250.00 <br />$ 250.00 <br />38 <br />1 -09 <br />Mobilization <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />39 <br />1 -10 <br />Project Temporary Traffic Control <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 12,500.00 <br />$ 12,500.00 <br />40 <br />2 -02 <br />Cement Conc. Sidewalk Removal Incl. Haul <br />25 <br />SY <br />$ 60.00 <br />$ 1,500.00 <br />$ 120.00 <br />$ 3,000.00 <br />$ 60.00 <br />$ 1,500.00 <br />41 <br />2 -02 <br />Cement Conc. Curb Removal Incl. Haul <br />40 <br />LF <br />$ 35.00 <br />$ 1,400.00 <br />$ 65.00 <br />$ 2,600.00 <br />$ 30.00 <br />$ 1,200.00 <br />42 <br />2 -03 <br />Roadway Excavation Incl. Haul <br />210 <br />CY <br />$ 80.00 <br />$ 16,800.00 <br />$ 140.00 <br />$ 29,400.00 <br />$ 90.00 <br />$ 18,900.00 <br />43 <br />2 -03 <br />Unsuitable Foundation Excavation Incl. Haul <br />20 <br />CY <br />$ 90.00 <br />$ 1,800.00 <br />$ 78.00 <br />$ 1,560.00 <br />$ 90.00 <br />$ 1,800.00 <br />44 <br />4 -04 <br />Crushed Surfacing Top Course <br />10 <br />TON <br />$ 65.00 <br />$ 650.00 <br />$ 66.00 <br />$ 660.00 <br />$ 65.00 <br />$ 650.00 <br />45 <br />5 -04 <br />HMA Cl. 1/2" PG 64 -22 <br />390 <br />TON <br />$ 105.00 <br />$ 40,950.00 <br />$ 100.00 <br />$ 39,000.00 <br />$ 115.00 <br />$ 44,850.00 <br />46 <br />8 -01 <br />Inlet Protection <br />6 <br />EA <br />$ 80.00 <br />$ 480.00 <br />$ 60.00 <br />$ 360.00 <br />$ 50.00 <br />$ 300.00 <br />47 <br />8 -04 <br />Cement Conc. Traffic Curb and Gutter <br />40 <br />LF <br />$ 60.00 <br />$ 2,400.00 <br />$ 30.00 <br />$ 1,200.00 <br />$ 60.00 <br />$ 2,400.00 <br />48 <br />8 -04 <br />Cement Conc. Traffic Curb <br />190 <br />LF <br />$ 42.00 <br />$ 7,980.00 <br />$ 30.00 <br />$ 5,700.00 <br />$ 40.00 <br />$ 7,600.00 <br />49 <br />8 -04 <br />Cement Conc. Extruded Curb Type 6 <br />130 <br />LF <br />$ 15.00 <br />$ 1,950.00 <br />$ 15.00 <br />$ 1,950.00 <br />$ 12.50 <br />$ 1,625.00 <br />SIDEWALK (SCHEDULE B) <br />50 <br />8 -14 <br />Cement Conc. Sidewalk <br />30 <br />SY <br />$ 75.00 <br />$ 2,250.00 <br />$ 80.00 <br />$ 2,400.00 <br />$ 75.00 <br />$ 2,250.00 <br />51 <br />8 -14 <br />Cement Conc. Curb Ramp <br />1 <br />EA <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 2,900.00 <br />$ 2,900.00 <br />STORM SEWER (SCHEDULE B) <br />52 I 7 -05 (Adjust Catch Basin <br />2 <br />EA <br />$ 600.00 <br />$ 1,200.00 <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 625.00 <br />$ 1,250.00 <br />TRAFFIC CONTROL DEVICES (SCHEDULE: B) <br />53 ( 8 -22 'Plastic Line, 4 Inch <br />220 <br />LF <br />$ 2.50 <br />$ 550.00 <br />$ 7.00 <br />$ 1,540.00 <br />$ 5.00 <br />$ 1,100.00 <br />TOTAL <br />SCHEDULE B <br />103,310.00 <br />TOTAL <br />SCHEDULE B <br />$ 108,370.00 <br />TOTAL <br />SCHEDULE B <br />121,575.00 <br />TOTAL <br />ESTIMATE <br />$ 672,610.00 <br />TOTAL BID <br />$ 659,441.00 <br />TOTAL BID <br />$ 769,860.00 <br />2 of 2 <br />