CITY OF TUKWILA
<br />DEPARTMENT OF PUBLIC WORKS
<br />2017 Overlay
<br />BID TABULATION
<br />Tukwila Project # 90610401
<br />.SL\i rl.t . tnr_O;NAA
<br />July 13, 2017
<br />Engineer's Estimate
<br />kCP»� DA e vev 1 0 �00 7±I f;Ita
<br />�` �afiia
<br />��
<br />f ekls bf1'W4DB
<br />Lakeridge Paving Company, LLC
<br />No.
<br />ROADWAY
<br />Section No.
<br />(SCHEDULE
<br />Item
<br />B)
<br />Qtv
<br />Unit
<br />Unit Cost
<br />Total Cost
<br />Unit Cost
<br />Total Cost
<br />Unit Cost
<br />Total Cost
<br />36
<br />1 -04
<br />Unexpected Site Changes
<br />1
<br />FA
<br />$ 500.00
<br />$ 500.00
<br />$ 500.00
<br />$ 500.00
<br />$ 500.00
<br />$ 500.00
<br />37
<br />1 -07
<br />SPCC Plan
<br />1
<br />LS
<br />$ 400.00
<br />$ 400.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 250.00
<br />$ 250.00
<br />38
<br />1 -09
<br />Mobilization
<br />1
<br />LS
<br />$ 10,000.00
<br />$ 10,000.00
<br />$ 8,000.00
<br />$ 8,000.00
<br />$ 20,000.00
<br />$ 20,000.00
<br />39
<br />1 -10
<br />Project Temporary Traffic Control
<br />1
<br />LS
<br />$ 10,000.00
<br />$ 10,000.00
<br />$ 3,000.00
<br />$ 3,000.00
<br />$ 12,500.00
<br />$ 12,500.00
<br />40
<br />2 -02
<br />Cement Conc. Sidewalk Removal Incl. Haul
<br />25
<br />SY
<br />$ 60.00
<br />$ 1,500.00
<br />$ 120.00
<br />$ 3,000.00
<br />$ 60.00
<br />$ 1,500.00
<br />41
<br />2 -02
<br />Cement Conc. Curb Removal Incl. Haul
<br />40
<br />LF
<br />$ 35.00
<br />$ 1,400.00
<br />$ 65.00
<br />$ 2,600.00
<br />$ 30.00
<br />$ 1,200.00
<br />42
<br />2 -03
<br />Roadway Excavation Incl. Haul
<br />210
<br />CY
<br />$ 80.00
<br />$ 16,800.00
<br />$ 140.00
<br />$ 29,400.00
<br />$ 90.00
<br />$ 18,900.00
<br />43
<br />2 -03
<br />Unsuitable Foundation Excavation Incl. Haul
<br />20
<br />CY
<br />$ 90.00
<br />$ 1,800.00
<br />$ 78.00
<br />$ 1,560.00
<br />$ 90.00
<br />$ 1,800.00
<br />44
<br />4 -04
<br />Crushed Surfacing Top Course
<br />10
<br />TON
<br />$ 65.00
<br />$ 650.00
<br />$ 66.00
<br />$ 660.00
<br />$ 65.00
<br />$ 650.00
<br />45
<br />5 -04
<br />HMA Cl. 1/2" PG 64 -22
<br />390
<br />TON
<br />$ 105.00
<br />$ 40,950.00
<br />$ 100.00
<br />$ 39,000.00
<br />$ 115.00
<br />$ 44,850.00
<br />46
<br />8 -01
<br />Inlet Protection
<br />6
<br />EA
<br />$ 80.00
<br />$ 480.00
<br />$ 60.00
<br />$ 360.00
<br />$ 50.00
<br />$ 300.00
<br />47
<br />8 -04
<br />Cement Conc. Traffic Curb and Gutter
<br />40
<br />LF
<br />$ 60.00
<br />$ 2,400.00
<br />$ 30.00
<br />$ 1,200.00
<br />$ 60.00
<br />$ 2,400.00
<br />48
<br />8 -04
<br />Cement Conc. Traffic Curb
<br />190
<br />LF
<br />$ 42.00
<br />$ 7,980.00
<br />$ 30.00
<br />$ 5,700.00
<br />$ 40.00
<br />$ 7,600.00
<br />49
<br />8 -04
<br />Cement Conc. Extruded Curb Type 6
<br />130
<br />LF
<br />$ 15.00
<br />$ 1,950.00
<br />$ 15.00
<br />$ 1,950.00
<br />$ 12.50
<br />$ 1,625.00
<br />SIDEWALK (SCHEDULE B)
<br />50
<br />8 -14
<br />Cement Conc. Sidewalk
<br />30
<br />SY
<br />$ 75.00
<br />$ 2,250.00
<br />$ 80.00
<br />$ 2,400.00
<br />$ 75.00
<br />$ 2,250.00
<br />51
<br />8 -14
<br />Cement Conc. Curb Ramp
<br />1
<br />EA
<br />$ 2,500.00
<br />$ 2,500.00
<br />$ 3,500.00
<br />$ 3,500.00
<br />$ 2,900.00
<br />$ 2,900.00
<br />STORM SEWER (SCHEDULE B)
<br />52 I 7 -05 (Adjust Catch Basin
<br />2
<br />EA
<br />$ 600.00
<br />$ 1,200.00
<br />$ 1,000.00
<br />$ 2,000.00
<br />$ 625.00
<br />$ 1,250.00
<br />TRAFFIC CONTROL DEVICES (SCHEDULE: B)
<br />53 ( 8 -22 'Plastic Line, 4 Inch
<br />220
<br />LF
<br />$ 2.50
<br />$ 550.00
<br />$ 7.00
<br />$ 1,540.00
<br />$ 5.00
<br />$ 1,100.00
<br />TOTAL
<br />SCHEDULE B
<br />103,310.00
<br />TOTAL
<br />SCHEDULE B
<br />$ 108,370.00
<br />TOTAL
<br />SCHEDULE B
<br />121,575.00
<br />TOTAL
<br />ESTIMATE
<br />$ 672,610.00
<br />TOTAL BID
<br />$ 659,441.00
<br />TOTAL BID
<br />$ 769,860.00
<br />2 of 2