City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:50:28 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A -2 <br />Management System (SAMS), verifying business licensing, reviewing insurance documentation, <br />verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of Wages Paid. All <br />subcontractor documentation will be logged into KPG's subcontractor logs. <br />L. Record Drawings: Review record drawings prepared by the Contractor, and prepare a <br />conformed set of project record drawings based on Contractor provided information and from <br />inspection notes. Record drawings to be verified on a monthly basis, as part of the progress <br />payment to the Contractor. Upon project completion, contractor provided markups will be <br />verified for completeness and supplemented with inspection information. The Consultant will <br />provide the marked up plan sheets with both the contractors and inspectors as -built <br />information. Revisions to the CAD drawings are not included <br />M. Physical Completion Letter: Following completion of all punchlist work, prepare physical <br />completion letter to the contractor, and recommend that City and /or Utilities accept the <br />project. <br />N. Project Closeout: Transfer all project documents to the City for permanent storage. <br />• Schedule review comments <br />• As -built schedule <br />• Meeting agendas and notes <br />• Monthly Pay Estimates <br />• Subcontractor Packets <br />• Cost Projection <br />• Physical Completion Letter <br />• Final Project Documents <br />TASK 4.5 — SUBMITTAL /RFI PROCESSING <br />A. Submittals: Coordinate review process for shop drawings, samples, traffic control plans, test <br />reports, and other submittals from the Contractor for compliance with the contract documents. <br />Key submittals to be transmitted to the City for their review and approval. Submittals shall be <br />logged and tracked. <br />B. Request for Information (RFI): Review and respond to RFI's. RFI's shall be logged and tracked. <br />C. Record of Materials (ROM): Utilize ROM prepared by KPG and update based on Special <br />Provisions and Plans for use on the project, based on the contract specifications. The ROM will be <br />maintained by the Resident Engineer. The ROM will track all of the materials delivered to the site <br />including manufacturer /supplier, approved RAM's, QPL items, material compliance <br />documentation, and all other required documentation. <br />Deliverables <br />• Submittal log <br />• RFI Log <br />• Completed Record of Material for Material Certification <br />TASK 4.6 — CHANGE MANAGEMENT <br />A. Case Log: Develop and maintain a case log which includes change orders, RFP's, Field Work <br />Directives <br />City of Tukwila — 2017 Overlay Program Page 7 of 7 KPG <br />Construction Management Services Project Number 16101 <br />Scope of Work 717117 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.