|
Exhibit A
<br />40 -42nd Avenue S Phase III Project Bid Tabulation
<br />Active Construction
<br />Bid item
<br />No.
<br />Item Descri tion
<br />P
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Price
<br />Schedule A - Roadway
<br />Al
<br />Mobilization
<br />1
<br />LS
<br />$
<br />618,423.04
<br />$
<br />618,423.04
<br />A2
<br />Resolution of Utility Conflicts
<br />1
<br />FA
<br />$
<br />20,000.00
<br />$
<br />20,000.00
<br />A3
<br />Field Office Building
<br />1
<br />LS
<br />$
<br />25,000.00
<br />$
<br />25,000.00
<br />A4
<br />Type B Progress Schedule, min. Bid $5,000.00
<br />1
<br />LS
<br />$
<br />10,000.00
<br />$
<br />10,000.00
<br />A5
<br />Unexpected Site Changes
<br />1
<br />FA
<br />$
<br />15,000.00
<br />$
<br />15,000.00
<br />A6
<br />Record Drawings, min. Bid $5,000.00
<br />1
<br />LS
<br />$
<br />5,000.00
<br />$
<br />5,000.00
<br />A7
<br />Roadway Surveying
<br />1
<br />LS
<br />$
<br />55,000.00
<br />$
<br />55,000.00
<br />A8
<br />Utility Potholing
<br />1
<br />FA
<br />$
<br />15,000.00
<br />$
<br />15,000.00
<br />A9
<br />Flaggers and Spotters, min. Bid $50.00 per hour
<br />2200
<br />HR
<br />$
<br />66.00
<br />$
<br />145,200.00
<br />A10
<br />Other Traffic Control Labor, min. Bid $50.00 per hour
<br />500
<br />HR
<br />$
<br />66.00
<br />$
<br />33,000.00
<br />All
<br />Traffic Control Supervisor, min. Bid $50.00 per hour
<br />320
<br />HR
<br />$
<br />66.00
<br />$
<br />21,120.00
<br />Al2
<br />Construction Signs Class A
<br />250
<br />SF
<br />$
<br />27.00
<br />$
<br />6,750.00
<br />A13
<br />Sequential Arrow Sign
<br />750
<br />HR
<br />$
<br />2.00
<br />$
<br />1,500.00
<br />A14
<br />Portable Changeable Message Sign
<br />970
<br />HR
<br />$
<br />4.00
<br />$
<br />3,880.00
<br />A15
<br />Outside Agency Uniformed Police Flagging Labor
<br />1
<br />FA
<br />$
<br />3,000.00
<br />$
<br />3,000.00
<br />A16
<br />Clearing and Grubbing
<br />2.0
<br />AC
<br />$
<br />45,000.00
<br />$
<br />90,000.00
<br />A17
<br />Roadside Cleanup
<br />1
<br />FA
<br />$
<br />5,000.00
<br />$
<br />5,000.00
<br />A18
<br />Remove Existing Drainage Structure
<br />18
<br />EA
<br />$
<br />200.00
<br />$
<br />3,600.00
<br />A19
<br />Remove Existing Storm Sewer Pipe
<br />1800
<br />LF
<br />$
<br />21.00
<br />$
<br />37,800.00
<br />A20
<br />Removal of Structure and Obstructions
<br />1
<br />LS
<br />$
<br />75,000.00
<br />$
<br />75,000.00
<br />A21
<br />Removal and Relocation of Existing Private Improvements
<br />1
<br />FA
<br />$
<br />8,000.00
<br />$
<br />8,000.00
<br />A22
<br />Pavement Sawcutting
<br />3810
<br />LF
<br />$
<br />3.00
<br />$
<br />11,430.00
<br />A23
<br />Remove Hydrant
<br />2
<br />EA
<br />$
<br />5,500.00
<br />$
<br />11,000.00
<br />A24
<br />Roadway Excavation Incl. Haul
<br />2600
<br />CY
<br />$
<br />42.00
<br />$
<br />109,200.00
<br />A25
<br />Gravel Borrow Incl. Haul
<br />5050
<br />CY
<br />$
<br />5.00
<br />$
<br />25,250.00
<br />A26
<br />Gravel Backfill for Walls Incl. Haul
<br />20
<br />CY
<br />$
<br />275.00
<br />$
<br />5,500.00
<br />A27
<br />Shoring or Extra Excavation Class B
<br />16300
<br />SF
<br />$
<br />0.35
<br />$
<br />5,705.00
<br />A28
<br />Structure Excavation Class A Incl. Haul
<br />270
<br />CY
<br />$
<br />60.00
<br />$
<br />16,200.00
<br />A29
<br />Temporary Structural Shoring for Detention Vault
<br />1
<br />LS
<br />$
<br />75,000.00
<br />$
<br />75,000.00
<br />A30
<br />Construction Geotextile for Permanent Erosion Control
<br />150
<br />SY
<br />$
<br />5.00
<br />$
<br />750.00
<br />A31
<br />Construction Geotextile for Separation
<br />1120
<br />SY
<br />$
<br />4.00
<br />$
<br />4,480.00
<br />A32
<br />Construction Geotextile for Underground Drainage
<br />240
<br />SY
<br />$
<br />4.00
<br />$
<br />960.00
<br />A33
<br />Crushed Surfacing Top Course
<br />870
<br />TON
<br />$
<br />40.00
<br />$
<br />34,800.00
<br />A34
<br />Crushed Surfacing Base Course
<br />2435
<br />TON
<br />$
<br />36.00
<br />$
<br />87,660.00
<br />A35
<br />Ballast
<br />35
<br />TON
<br />$
<br />111.00
<br />$
<br />3,885.00
<br />A36
<br />HMA Cl. 1/2 -inch PG 64 -22
<br />1125
<br />TON
<br />$
<br />106.00
<br />$
<br />119,250.00
<br />A37
<br />HMA Cl. 1 -inch PG 64 -22
<br />1415
<br />TON
<br />$
<br />100.00
<br />$
<br />141,500.00
<br />A38
<br />Pavement Repair Excavation Incl. Haul
<br />300
<br />SY
<br />$
<br />33.00
<br />$
<br />9,900.00
<br />A39
<br />HMA for Pavement Repair Cl. 1/2 -inch PG 64 -22
<br />205
<br />TON
<br />$
<br />150.00
<br />$
<br />30,750.00
<br />A40
<br />Planing Bitumious Pavement
<br />315
<br />SY
<br />$
<br />20.00
<br />$
<br />6,300.00
<br />A41
<br />Cement Concrete Pavement
<br />40
<br />CY
<br />$
<br />335.00
<br />$
<br />13,400.00
<br />A42
<br />Single Sloped Concrete Barrier
<br />150
<br />LF
<br />$
<br />165.00
<br />$
<br />24,750.00
<br />A43
<br />Gravel Backfill for Drain
<br />30
<br />CY
<br />$
<br />70.00
<br />$
<br />2,100.00
<br />A44
<br />Underdrain Pipe 6 In. Diam.
<br />285
<br />LF
<br />$
<br />14.00
<br />$
<br />3,990.00
<br />A45
<br />Underdrain Pipe 8 In. Diam.
<br />181
<br />LF
<br />$
<br />21.00
<br />$
<br />3,801.00
<br />A46
<br />Drain Pipe 6 In. Diam.
<br />70
<br />LF
<br />$
<br />33.00
<br />$
<br />2,310.00
<br />A47
<br />Drain Pipe 8 In. Diam.
<br />100
<br />LF
<br />$
<br />35.00
<br />$
<br />3,500.00
<br />A48
<br />Testing Storm Sewer Pipe
<br />3352
<br />LF
<br />$
<br />2.00
<br />$
<br />6,704.00
<br />A49
<br />Corrugated polyethlyene Storm Sewer Pipe 8 In. Diam.
<br />38
<br />LF
<br />$
<br />45.00
<br />$
<br />1,710.00
<br />A50
<br />Corrugated polyethlyene Storm Sewer Pipe 12 In. Diam.
<br />942
<br />LF
<br />$
<br />40.00
<br />$
<br />37,680.00
<br />A51
<br />Corrugated polyethlyene Storm Sewer Pipe 18 In. Diam.
<br />929
<br />LF
<br />$
<br />55.00
<br />$
<br />51,095.00
<br />A52
<br />Corrugated polyethlyene Storm Sewer Pipe 24 In. Diam.
<br />927
<br />LF
<br />$
<br />80.00
<br />$
<br />74,160.00
<br />A53
<br />Cl. V Reinf. Conc. Storm Sewer Pipe 30 In. Diam.
<br />36
<br />LF
<br />$
<br />190.00
<br />$
<br />6,840.00
<br />A54
<br />Ductile Iron Storm Sewer Pipe 8 In. Diam.
<br />89
<br />LF
<br />$
<br />55.00
<br />$
<br />4,895.00
<br />A55
<br />Ductile Iron Storm Sewer Pipe 12 In. Diam.
<br />316
<br />LF
<br />$
<br />75.00
<br />$
<br />23,700.00
<br />A56
<br />Ductile Iron Storm Sewer Pipe 18 In. Diam.
<br />75
<br />LF
<br />$
<br />110.00
<br />$
<br />8,250.00
<br />A57
<br />Adjust Catch Basin
<br />5
<br />EA
<br />$
<br />750.00.
<br />$
<br />3,750.00
<br />A58
<br />Adjust Manhole
<br />20
<br />EA
<br />$
<br />950.00
<br />$
<br />19,000.00
<br />A59
<br />Concrete Inlet
<br />25
<br />EA
<br />$
<br />1,400.00
<br />$
<br />35,000.00
<br />A60
<br />Catch Basin Type 1
<br />29
<br />EA
<br />$
<br />1,200.00
<br />$
<br />34,800.00
<br />A61
<br />Catch Basin Type 1 with Circular Frame and Cover
<br />1
<br />EA
<br />$
<br />1,300.00
<br />$
<br />1,300.00
<br />A62
<br />Catch Basin Type 1L
<br />6
<br />EA
<br />$
<br />1,300.00
<br />$
<br />7,800.00
<br />A63
<br />Catch Basin Type 2, 481n. Diam.
<br />20
<br />EA
<br />$
<br />3,000.00
<br />$
<br />60,000.00
<br />A64
<br />Catch Basin Type 2, 541n. Diam. With Flow Restrictor
<br />1
<br />EA
<br />$
<br />6,300.00
<br />$
<br />6,300.00
<br />A65
<br />Detention Vault
<br />1
<br />LS
<br />$
<br />100,000.00
<br />$
<br />100,000.00
<br />A66
<br />Connection to Drainage Structure
<br />12
<br />EA
<br />$
<br />1,000.00
<br />$
<br />12,000.00
<br />A67
<br />Structure Excavation Class B Incl. Haul
<br />2800
<br />CY
<br />$
<br />-3.00$
<br />8,400.00
<br />A68
<br />Abandon and Fill Pipe
<br />310
<br />LF
<br />$
<br />22.00
<br />$
<br />6,820.00
<br />A69
<br />Through Curb Inlet
<br />2
<br />EA
<br />$
<br />1,225.00
<br />$
<br />2,450.00
<br />A70
<br />Hydrant Assembly
<br />5
<br />EA
<br />$
<br />8,000.00
<br />$
<br />40,000.00
<br />A71
<br />Resetting Existing Hydrant
<br />4
<br />EA
<br />$
<br />2,500.00
<br />$
<br />10,000.00
<br />A72
<br />Stormwater Pre - Treatment Unit A
<br />1
<br />LS
<br />$
<br />40,000.00
<br />$
<br />40,000.00
<br />A73
<br />Stormwater Treatment Unit B
<br />1
<br />LS
<br />$
<br />25,000.00
<br />$
<br />25,000.00
<br />A74
<br />Stormwater Treatment Unit C
<br />1
<br />LS
<br />$
<br />25,000.00
<br />$
<br />25,000.00
<br />City of Tukwila
<br />42nd Ave S - Phase III Bid Tab
<br />Page I of 4 55
<br />
|