|
95
<br />Exhibit A
<br />40 -42nd Avenue S Phase III Project Bid Tabulation
<br />Active Construction
<br />Bid Item
<br />No.
<br />Item Description
<br />P
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Price
<br />A75
<br />SWPPP Preparation And General Permit Compliance
<br />1
<br />LS
<br />$
<br />20,000.00
<br />$
<br />20,000.00
<br />A76
<br />Portable Storage Tank
<br />1
<br />LS
<br />$
<br />35,000.00
<br />$
<br />35,000.00
<br />A77
<br />ESC Lead
<br />45
<br />DAY
<br />$
<br />1.00
<br />$
<br />45.00
<br />A78
<br />Erosion/Water Pollution Control
<br />1
<br />FA
<br />$
<br />25,000.00
<br />$
<br />25,000.00
<br />A79
<br />High Visibiliy Fence
<br />1350
<br />LF
<br />$
<br />3.00
<br />$
<br />4,050.00
<br />A80
<br />Silt Fence
<br />620
<br />LF
<br />$
<br />6.00
<br />$
<br />3,720.00
<br />A81
<br />Check Dam
<br />168
<br />LF
<br />$
<br />15.00
<br />$
<br />2,520.00
<br />A82
<br />Inlet Protection
<br />18
<br />EA
<br />$
<br />70.00
<br />$
<br />1,260.00
<br />A83
<br />Biodegrable Erosion Control Blanket
<br />360
<br />SY
<br />$
<br />8.00
<br />$
<br />2,880.00
<br />A84
<br />Topsoil Type A (6" Depth)
<br />0.6
<br />ACRE
<br />$
<br />42,000.00
<br />$
<br />25,200.00
<br />A85
<br />Topsoil Type A (12" Depth)
<br />290
<br />SY
<br />$
<br />18.00
<br />$
<br />5,220.00
<br />A86
<br />SEED /SOD (MIX B)
<br />0.6
<br />ACRE
<br />$
<br />4,400.00
<br />$
<br />-
<br />2,640.00
<br />A87
<br />BARK OR WOOD CHIP MULCH (3" DEPTH)
<br />321
<br />SY
<br />$
<br />5.00
<br />$
<br />1,605.00
<br />A88
<br />PSIPE, PART-IENOCISSUS TRICUSPIDATA (4" POT)
<br />54
<br />EA
<br />$
<br />17.00
<br />$
<br />918.00
<br />A89
<br />PSIPE, BERBERUS THUNBERGII 'CRIMSON PYGMY' ( #3)
<br />102
<br />EA
<br />$
<br />38.00
<br />$
<br />3,876.00
<br />A90
<br />PSIPE, ROSA RUGOSA'SHOWY PAVEMENT' ( #3)
<br />90
<br />EA
<br />$
<br />38.00
<br />$
<br />3,420.00
<br />A91
<br />PSIPE, ACER CIRCINATUM(1.5" CALIPER)
<br />5
<br />EA
<br />$
<br />415.00
<br />$
<br />2,075.00
<br />A92
<br />PSIPE, RHPHIOLEPIS X DEIACOURII 'GEORGIA PETITE' ( #3)
<br />73
<br />EA
<br />$
<br />110.00
<br />$
<br />8,030.00
<br />A93
<br />PSIPE, PHYSOCARPUS OPULIFOIUS'PODARUS' ( #3)
<br />60
<br />EA
<br />$
<br />43.00
<br />$
<br />2,580.00
<br />A94
<br />Cement Conc. Traffic Curb and Gutter
<br />4312
<br />LF
<br />$
<br />20.00
<br />$
<br />86,240.00
<br />A95
<br />Extruded Curb, Type 6
<br />176
<br />LF
<br />$
<br />6.00
<br />$
<br />1,056.00
<br />A96
<br />Integral Curb Wall
<br />20
<br />SF
<br />$
<br />55.00
<br />$
<br />1,100.00
<br />A97
<br />Cement Conc. Driveway Entrance
<br />770
<br />SY
<br />$
<br />71.00
<br />$
<br />54,670.00
<br />A98
<br />Raised Pavement Marker Type 1
<br />16
<br />Hundred
<br />$
<br />165.00
<br />$
<br />2,640.00
<br />A99
<br />Raised Pavement Marker Type 2
<br />5
<br />Hundred
<br />$
<br />465.00
<br />$
<br />2,325.00
<br />A100
<br />Raising Existing Beam Guardrail
<br />38
<br />LF
<br />$
<br />87.00
<br />$
<br />3,306.00
<br />A101
<br />Black Vinyl Coated Chain Link Fence Type 3
<br />110
<br />LF
<br />$
<br />37.00
<br />$
<br />4,070.00
<br />A102
<br />Black Vinyl Coated Chain Link Fence Type 4
<br />266
<br />LF
<br />$
<br />33.00
<br />$
<br />8,778.00
<br />A103
<br />Black Vinyl Coated Double 14' Chain Link Gate
<br />1
<br />EA
<br />$
<br />925.00
<br />$
<br />925.00
<br />A104
<br />Adjust Monument
<br />2
<br />EA
<br />$
<br />400.00
<br />$
<br />800.00
<br />A105
<br />Cement Conc Sidewalk
<br />2520
<br />SY
<br />$
<br />55.00
<br />$
<br />138,600.00
<br />A106
<br />Cement Conc Curb Ramp, Type A
<br />2
<br />EA
<br />$
<br />1,300.00
<br />$
<br />2,600.00
<br />A107
<br />Cement Conc Curb Ramp Type Parallel A
<br />8
<br />EA
<br />$
<br />2,400.00
<br />$
<br />19,200.00
<br />A108
<br />Paved Buffer Zone
<br />290
<br />SY
<br />$
<br />120.00
<br />$
<br />34,800.00
<br />A109
<br />Quarry Spalls
<br />25
<br />TON
<br />$
<br />170.00
<br />$
<br />4,250.00
<br />A110
<br />Mailbox Support, Type 1
<br />8
<br />EA
<br />$
<br />500.00
<br />$
<br />4,000.00
<br />A111
<br />Mailbox Support, Type 2
<br />3
<br />EA
<br />$
<br />1,000.00
<br />$
<br />3,000.00
<br />A112
<br />Illumination System Complete
<br />1
<br />LS
<br />$
<br />300,000.00
<br />$
<br />300,000.00
<br />A113
<br />Permanent Signing
<br />1
<br />LS
<br />$
<br />10,000.00
<br />$
<br />10,000.00
<br />Al 14
<br />Plastic Stop Line
<br />50
<br />LF
<br />$
<br />7.00
<br />$
<br />350.00
<br />A115
<br />Plastic Line (4 ")
<br />2523
<br />LF
<br />$
<br />1.00
<br />$
<br />2,523.00
<br />A116
<br />Plastic Bicycle Lane Symbol
<br />10
<br />EA
<br />$
<br />400.00
<br />$
<br />4,000.00
<br />Al 17
<br />Plastic Crosswalk Line
<br />110
<br />SF
<br />$
<br />4.00
<br />$
<br />440.00
<br />A118
<br />Plastic Traffic Arrow
<br />2
<br />EA
<br />$
<br />55.00
<br />$
<br />110.00
<br />A119
<br />Plastic Sharrow Symbol
<br />12
<br />EA
<br />$
<br />400.00
<br />$
<br />4,800.00
<br />A120
<br />Temporary Pavement Markings
<br />4000
<br />LF
<br />$
<br />1.00
<br />$
<br />4,000.00
<br />A121
<br />Rock for Rock Wall
<br />340
<br />TON
<br />$
<br />171.00
<br />$
<br />58,140.00
<br />A122
<br />Backfill for Rock Wall
<br />130
<br />CY
<br />$
<br />55.00
<br />$
<br />7,150.00
<br />A123
<br />Compacted Till
<br />70
<br />CY
<br />$
<br />21.00
<br />$
<br />1,470.00
<br />A124
<br />Adjust Valve Box to Grade
<br />20
<br />EA
<br />$
<br />325.00
<br />$
<br />6,500.00
<br />Al 25
<br />Adjust Meter Box to Grade
<br />10
<br />EA
<br />$
<br />125.00
<br />$
<br />1,250.00
<br />Subtotal
<br />Schedule A
<br />$
<br />3,526,430.04
<br />Schedule B - Gilliam Creek Culvert
<br />B1
<br />Unexpected Site Changes
<br />1
<br />FA
<br />$
<br />15,000.00
<br />$
<br />15,000.00
<br />B2
<br />Clearing and Grubbing
<br />0.4
<br />AC
<br />$
<br />50,000.00
<br />$
<br />20,000.00
<br />B3
<br />Remove Existing Pipe
<br />94
<br />LF
<br />$
<br />15.00
<br />$
<br />1,410.00
<br />B4
<br />Roadway Excavation Incl. Haul
<br />4200
<br />CY
<br />CY
<br />$
<br />$
<br />35.00
<br />20.00
<br />$
<br />$
<br />147,000.00
<br />74,000.00
<br />B5
<br />Gravel Borrow Incl. Haul
<br />3700
<br />B6
<br />Temporary Structural Shoring for Culvert Footing
<br />1
<br />LS
<br />$
<br />50,000.00
<br />$
<br />50,000.00
<br />B7
<br />Conc. Class 4000 for Culvert Footing
<br />170
<br />CY
<br />$
<br />500.00
<br />$
<br />85,000.00
<br />B8
<br />St. Reinf. Bar for Culvert Footing
<br />24000
<br />LBS
<br />$
<br />2.00
<br />$
<br />48,000.00
<br />B9
<br />St. Str. Plate Arch 10 Gage 16 ft. Span
<br />146
<br />LF
<br />$
<br />1,350.00
<br />$
<br />197,100.00
<br />B10
<br />Steambed Boulders - One Man
<br />88
<br />TON
<br />$
<br />115.00
<br />$
<br />10,120.00
<br />B11
<br />Steambed Boulders - Two Man
<br />88
<br />TON
<br />$
<br />103.00
<br />$
<br />9,064.00
<br />B12
<br />Steambed Cobbles
<br />675
<br />TON
<br />$
<br />52.00
<br />$
<br />35,100.00
<br />B13
<br />Coarse Band
<br />3
<br />EA
<br />$
<br />1,750.00
<br />$
<br />5,250.00
<br />B14
<br />Temporary Stream Diversion
<br />1
<br />LS
<br />$
<br />40,000.00
<br />$
<br />40,000.00
<br />B15
<br />High Visibiliy Fence
<br />250
<br />LF
<br />$
<br />3.00
<br />$
<br />750.00
<br />B16
<br />Topsoil Type A (4" Depth)
<br />0.20
<br />ACRE
<br />$
<br />30,000.00
<br />$
<br />6,000.00
<br />B17
<br />Seed, Fertilize & Mulching (Native Seed Mix A)
<br />0.20
<br />ACRE
<br />$
<br />5,000.00
<br />$
<br />1,000.00
<br />B18
<br />Fine Compost (3" depth)
<br />0.20
<br />ACRE
<br />$
<br />35,000.00
<br />$
<br />7,000.00
<br />B19
<br />PSIPE, SALIX LASIANDRA ( #3)
<br />4
<br />EA
<br />$
<br />21.00
<br />$
<br />84.00
<br />B20
<br />PSIPE, SALIX SCOULERIANA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B21
<br />PSIPE, BETULA PAPYRIFERA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B22
<br />PSIPE, FRAXINUS LATIFOLIA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />City of Tukwila
<br />42nd Ave S - Phase III
<br />Bid Tab
<br />Page 2 of 4
<br />
|